Laserfiche WebLink
This email message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any <br />unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by <br />reply email and destroy all copies of the original message. <br />From: Matt Taylor <br />Sent: Tuesday, March 13, 2018 3:08 PM <br />To: 'Michael Kith [EH] <mkith@sicehd.com > <br />Subject: RE: Well Construction Permit Application - Tracy Hills Site - Proposed Elementary School <br />Good afternoon Michael, <br />Please find as an attachment a revised Site Mitigation Well & Boring Permit Application for the Tracy Hills Site - <br />Proposed Elementary School located at 29650 South Corral Hollow Road in Tracy, CA. As discussed, we are installing 7 <br />soil vapor probes that will most likely remain active for at least 1 month and 2 ground water monitoring wells. <br />The well construction details are summarized below. <br />Soil Gas Sampling Probe Installation (7) <br />Seven soil borings will be converted into 5-foot and 10-foot deep nested soil gas sampling probes (see attached Figure <br />6). Each soil boring will be converted into a temporary soil gas sampling probe using the methods below. <br />5-foot Deep Soil Gas Sampling Probes <br />Install a 1-inch stainless steel implant with a 50-micron filtration rating attached to a 1/4 -inch <br />diameter Teflon tubing into each of the 10 foot deep borings at 9.5 feet bgs <br />Install a 1-inch stainless steel implant with a 50-micron filtration rating attached to a 1/4 inch <br />diameter Teflon tubing into each of the 5 foot deep borings at 4.5 feet bgs <br />The stainless steel implant will be centered within a 1-foot long sand filter pack composed of #2/12 <br />clean sand <br />A 1-foot long transitional seal composed of dry granular bentonite will be installed above the sand <br />filter packs and hydrated for at least 2 hours <br />A 2-foot surface seal of hydrated powdered bentonite will be installed above the bentonite and a <br />one foot concrete will be placed above the cement to surface grade <br />A traffic grade flush mount well box will be installed at the surface for each boring <br />Installation of Groundwater Monitoring Wells (2) <br />Two temporary groundwater monitoring wells will be installed at the southern portion of the Site to determine if <br />groundwater would pose a possible vapor intrusion threat. The proposed scope of work for monitoring well installation <br />is as follows: <br />Convert the soil borings into two-inch diameter temporary groundwater monitoring wells using 20 feet of 0.01- <br />inch screened two-inch diameter Schedule 40 PVC casing and 80 feet of two-inch diameter Schedule 40 PVC <br />casing, number 2/12 sand up to 78 feet bgs, bentonite (hydrated) from 75 feet bgs to 78 feet bgs, completed <br />3