My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
930
>
2900 - Site Mitigation Program
>
PR0542541
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 11:19:59 AM
Creation date
6/11/2021 10:57:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542541
PE
2950
FACILITY_ID
FA0024463
FACILITY_NAME
ALL MINI VANS AND MINI TRUCKS AUTO DISMANTLER
STREET_NUMBER
930
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718303
CURRENT_STATUS
01
SITE_LOCATION
930 E CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Partner Site-Specific Health and Safety Plan <br />Introduction <br />Partner Engineering and Science, Inc. (Partner) has been retained by Bank of Hope to conduct a Phase II Subsurface <br />Investigation at the subject property. This Health and Safety Plan (HASP) document identifies the Health and <br />Safety procedures that are intended to guide the field activities at the site. The details of this plan apply to employees <br />of Partner and its subcontractors. Regulatory agencies are expected to observe the safety rules and regulations <br />established by their respective organizations in addition to the requirements of this document. <br />This plan must be reviewed and acknowledged by all personnel prior to entering the exclusion zone. In general, a <br />"Tailgate Safety Meeting" is conducted at the initiation of on-site activities and at the beginning of each day <br />thereafter until the completion of the project. However, the actual briefing may be conducted off-site (e.g., in the <br />office) if conditions preclude or render impractical its completion on-site. <br />This HASP will be a living document in that it will be continually updated and/or revised as the site conditions and <br />knowledge of the operations develop further. The development and preparation of the HASP has been based on past <br />experiences and site specific information at the time of preparation. If actual site conditions or operations vary from <br />the data used to prepare this HASP, amendments shall be made to reflect those changes. <br />This HASP has been developed with consideration to current safety standards, health effects, and standards for <br />known contaminants and procedures designed to account for potential hazards from known and/or suspected <br />substances. In preparing this document, Partner has specifically reviewed Occupational Safety & Health <br />Administration (OSHA) Title 29 Code of Federal Regulations (CFR) 1910 & 1926, California Occupational Safety <br />& Health Administration (Cal/OSHA) Title 8 California Code of Regulations (CCR) 5192, the National Institute of <br />Occupational Safety & Health (NIOSH)/OSHA/United States Coast Guard (USCG)/Environmental Protection <br />Agency (EPA) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH <br />Pocket Guide to Chemical Hazards, and the American Conference of Governmental Industrial Hygienists, Inc. <br />(ACGIH) Threshold Limit Values for Chemical Substances and Chemical Agents. <br />Project Information <br />Project Type: <br />Site Name: <br />Address: <br />Partner Project Number: <br />Project Scope of Work <br />Phase II Subsurface Investigation <br />930 East Charter Way <br />930 East Charter Way <br />Stockton, CA 95206 <br />17-204651.2 <br />Advance eight total borings for soil, soil gas, and groundwater sampling for laboratory analysis. Two borings to 40 <br />feet bgs and six borings to 15 feet bgs. <br />Utility Clearance <br />Have necessary underground utility notifications for subsurface work been made? El Yes 0 Not Applicable <br />Partner Site-Specific Health and Safety Plan Page 1 <br />Version 1.02 <br /> <br />February 1, 2018
The URL can be used to link to this page
Your browser does not support the video tag.