My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
4025
>
2900 - Site Mitigation Program
>
PR0542547
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 11:22:08 AM
Creation date
6/11/2021 10:58:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542547
PE
2950
FACILITY_ID
FA0024467
FACILITY_NAME
JH SIMPSON CO INC
STREET_NUMBER
4025
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11530025
CURRENT_STATUS
01
SITE_LOCATION
4025 CORONADO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdvancedGeo <br />Environmental <br />February 2018 <br />AGE Project No. 17-4116 <br />Page 3 of 7 <br />Specific protective equipment for each level of protection used is follows: <br />Level D: <br />hard hat <br />steel-toed boots <br />half-faced respirator (if necessary) <br />gloves <br />safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Tim Cuellar Oversee operations/ PM <br />FIELD CREW: TASK: <br />Keith Lindgren Drill, advance borings <br />Rene Toth Collect samples, oversee operations <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work. <br />7.0. COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used: <br />Hand gripping throat: Out of air; cannot breath <br />Grip partner's wrist or both hands around <br />waist: <br />Leave area immediately
The URL can be used to link to this page
Your browser does not support the video tag.