SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: ,....S <br />FA#:) <br />00 Z % / 7_, PR# 6,Sy z31/3 <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. ,e . t- C <br />MFR to Accounting to <br />7,71„„ <br /> ensure project ha a # and a PR#. The PR# for a <br />agency chan es, a new PR# must be created under V <br />Provide <br />project does not change. If the lead <br />the existing FA. <br />/ el.__ 3 <br />i <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />Work Plan SR#: (/..,60 7'‘b <br />... ) <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency and that the mw <br />and well standards. <br />1)( CI <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />11,61 v\p#:oolgo-ui Scope: <br />a I,. ,,,,kre u-te4( cte-cfna-KA-- LY <br />• <br />WP#: (.70110 -v‘ Scope: <br />n 4 444""141 s•Jqk AteSkif-u44s,„ "V\ <br />L <br />WP#: Scope: <br /> <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />contamination present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist