Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: )4 33 fto041,‘ K4m..v..)100 sA._ <br />FA#: 00 7.-9 cieS" pR# es,..ii irad 2-‘461) <br />DATE 4 f_i I 18 ACTIVITY INITIAL <br />\-1 (Ls It g Review submittal and make sure all documents/fees have been submitted. LX <br />4140 Request documents/fees not submitted. L..- ---8( <br />`Atom I ig <br />' <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under project does not change. If the lead <br />the existing FA. <br />1 (j <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />L X <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />LI i L,4, Work Plan SR#: 0 0,-10 to i 1./1Y <br />ki l it <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency and that the mw <br />and well standards. <br />41 ii t l y <br />" <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. L --.Y.' project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />Li 1 itit, <br />WP#: 0 0.,1<olci Scope: 1 ,. i i_ <br />d ‘ v-,,e, I p ,""on -')(- <br />WP#: Scope: as..ArDia. 6 .• S-6-A-a_ ail 1 <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />'Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br />Site Mitigation Program Checklist