My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
4800 – General/Other Program
>
PR0543500
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 2:32:03 PM
Creation date
6/11/2021 2:00:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543500
PE
2960
FACILITY_ID
FA0024694
FACILITY_NAME
SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
147292090, 110
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Nuel Henderson [EH] <br />From: Nuel Henderson [EH] <br />Sent: Thursday, July 23, 2015 9:42 AM <br />To: 'Dave Vossler' <br />Cc: Lori Duncan [EH] <br />Subject: RE: 820 S. American St. Stockton, Ca. Siebold Drilling schedule <br />Dave, <br />Your permits have been extended and I have your drill dates calendared. <br />Nuel Henderson <br />(209) 468-3436 <br />From: Dave Vossler [mailto:Dave.Vossler@ghd.com] <br />Sent: Wednesday, July 22, 2015 7:20 PM <br />To: Nuel Henderson [EH]; Lori Duncan [EH] <br />Cc: Ryan Crawford <br />Subject: FW: 820 S. American St. Stockton, Ca. Siebold Drilling schedule <br />Nuel / Lori <br />I have not heard back regarding the drilling permit for the former Siebold property at 820 S. American <br />St., Stockton Ca. I am assuming we are good to go and will mark the site the week prior to the drilling <br />date of August 13th and 14th . The wells will be developed on Friday the 21st and the site will be sampled <br />on Monday the 24th of August. <br />David J. Vossler <br />Service Group Manager —Contaminant, Assessment & Remediation <br />GHD <br />T: 707-523-1010 I V: 849954 I F: 707-527-8679 I M: 707-477-1283 I E: Dave.Vossler@qhd.com <br />2235 Mercury Way, Suite 150, Santa Rosa, California 95407 USA I www.qhd.com <br />WATER I ENERGY & RESOURCES I ENVIRONMENT I PROPERTY & BUILDINGS I TRANSPORTATION <br />Please consider our environment before printing this email <br />From: Barton, Jim@Waterboards [mailtolinn.barton@waterboards.ca.gov] <br />Sent: Monday, July 13, 2015 1:58 PM <br />To: Dave Vossler <br />Cc: nhenderson@sjcehd.com ; Lori Duncan [EH]; Ryan Crawford <br />Subject: RE: 820 S. American St. Stockton, Ca. Siebold Drilling schedule <br />Thanks Dave for the drilling dates and discussion. Sounds like the property manager spends a lot of time <br />out of the country and wants to be involved in the work. Unfortunately I will be on vacation those two <br />days, so will ask Cori Condon or another staff to be present for the drilling. Please confirm the dates <br />with Tony Bader <br />Hi Nuel and Lori, <br />Please confirm these dates are acceptable and grant us an extension for the drilling permits. Thanks. <br />Jim Barton <br />8/13/2015
The URL can be used to link to this page
Your browser does not support the video tag.