Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: 3-7 I 5 6,,,......4• 14 A , <br />FA#: 0071-7,c, FR# cts-Li 1 6 2A TAO) <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />-7 13, i v <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR* for a <br />h agency changes, a new PR# must be created under L _ y project does not change. the ea d h If lead <br />the existing FA. <br />c‘i cq . <br />iy <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />t '11 <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />i no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />81 Co 118 Work Plan SR#: n" vv <br />g 1 ,/ <br />111 IA <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code <br /> <br />the lead agency and that the mw <br />and well standards. <br />Wg (, <br />I- 1 <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. (..- X <br />project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />a WP#: <br /> co 1 Ifr <br />Scope: <br />31 .5 '7 ei"echr...el VA-V • -e f'D 641 1..,,--Y <br />Vili 1 <br />WP#: <br />00510i <br />r <br />Scope: , 1 _ <br />.) 4.--tpxrein var.( erwat, <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized. <br />EHD-29 8/15/17 <br /> <br />Site Mitigation Program Checklist