My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2900 - Site Mitigation Program
>
PR0543661
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 3:03:55 PM
Creation date
6/11/2021 2:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543661
PE
2959
FACILITY_ID
FA0024810
FACILITY_NAME
GENERAL DYNAMICS - OTS
STREET_NUMBER
32727
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
32727 CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHOW ENGINEERING, INC. 7770 Pardee Lane, Suite 100, Oakland, CA 94621 <br />Tel: (510) 636-8500 FAX (510) 636-8544 <br />MEMO <br />DATE: August 3, 2018 <br />TO: San Joaquin County Environmental Health Dept. <br />FROM: Lisa Kimura -2_ <br />SUBJECT: Submittal for a Well Permit, 32727 Corral Hollow Road, Tracy, CA <br />Project No. 99R- 4041 <br />Enclosed please receive the following documents in support of a new Monitoring Well at the subject <br />location as part of an on-going groundwater investigation/remediation program under the Department of <br />Toxic Substances Control (DTSC) oversight for the former Tracy Test Facility, General Dynamics OTS. <br />New Well Information form <br />Check 48508 for $608 ($456+$152) for the permit and inspection fee <br />Additional Monitoring Well Work Plan dated June 2017 which includes a map of the proposed <br />well location <br />Email from Mr. Yongsheng Sun of DTSC approving the revised work plan <br />The current schedule with the driller Exploration Geoservices is to install the well on August 22, 2018. <br />Please let us know if you have any questions or need additional information.
The URL can be used to link to this page
Your browser does not support the video tag.