Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: 1.1s-k4 s c t l>.,,,, ra_4_,,,, s4 <br />FA#: 00411 PR# 0 c1-11 to C, -4, 7-q to 0 <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />I t 3 <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under L --"' project does not change. If the lead <br />the existing FA. <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />an SR# and document on the permit form. If <br />record the information on a golden rod Service <br />DAR to track time spent obtaining documents/ <br />permits, coordinating field work activities, reviewing <br />making notifications/referrals. <br />to link the SR to the related FA. Generate <br />no permit form has been submitted, <br />Request form. Use this SR# on your <br />fees, reviewing work plan, issuing <br />subsequent report/sample results, <br />nu, Work Plan SR#: CO 19 S-2-1 L.,--,)C <br />IC the <br />L/3 <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code lead agency and that the mw <br />and well standards. <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />L .-->< project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />Tif <br />WP#: v-. -SV 4,01 1 Scope: 2._ <br />,Soli bOCI eek-, Li-,-;-)c <br />41/) <br />WP#: <br />1 °° 3c610fi <br />Scope: 7_ r <br />SIV) WP#: <br />0 0 3 cg L7ci.ci <br />Scope: . <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose `Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />contamination present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EHD Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />'Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist