My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARLTON
>
705
>
2900 - Site Mitigation Program
>
PR0543763
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 4:32:33 PM
Creation date
6/11/2021 3:11:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543763
PE
2950
FACILITY_ID
FA0024877
FACILITY_NAME
VERTIV GROUP CORPORATION
STREET_NUMBER
705
Direction
N
STREET_NAME
CARLTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
705 N CARLTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Memorandum — Additional Subsurface Investigation Work Plan, September 11, 2018 <br />705 Carlton Avenue, Stockton, California <br />EFI Global Project Number 9836003958 <br />investigation co mpletion report formats, which includes; Su mmary of S ite Background, Sam piing <br />Activities and Results, Field Variances, Conclusions and Recommendations, and References. <br />The final report will be reviewed, signed, and approv ed by a California Professional Geologist and/or a <br />California Professional Engineer. <br />WORK SCHEDULE <br />EFI Global estimates that the entire project can be completed, including submittal of the report, within 4 <br />weeks after receipt of a soil boring permit and th e authorization to proceed from SJC EHD. The <br />anticipated time required to complete each task is as follows: <br /> Permitting and project mobilization I to 3 weeks <br /> Boring advancement and sampling I day <br /> Laboratory Analysis 1 week <br /> Report Preparation 1-2 weeks after <br />receipt of final <br />analytical results <br />This schedule is based on the assumption that access to the Site is readily available. The SJCEHD will be <br />notified in a dvance of the start of the field activ ities unless a deviation from the notification period is <br />requested. <br />EFI Global <br />Page 4 of 5 <br />•
The URL can be used to link to this page
Your browser does not support the video tag.