Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: 3.e, 1/1,61 V I 51-1A Of k till LA V-1 4Vy <br />FA#: 0 O'l Lt9 3 (I° PR# L9S143E(s-c IA Ve <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />2.---i <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under L Ac., project does not change. If the lead <br />the existing FA. <br />lo (5 <br /> <br />I <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />an SR# and document on the permit form. If <br />record the information on a golden rod Service <br />DAR to track time spent obtaining documents/ <br />permits, coordinating field work activities, reviewing <br />making notifications/referrals. <br />L---} <br />to link the SR to the related FA. Generate <br />no permit form has been submitted, <br />Request form. Use this SR# on your Request <br />fees, reviewing work plan, issuing <br />subsequent report/sample results, <br />/0 1135- Work Plan SR#: OD 1 GI 1 vc6, LX <br />10/30 <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code ., <br />L Y the lead agency and that the mw <br />and well standards. <br />ID 1.3 <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />L V project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />1° riio WP#: 0 0 Vtsci57- <br />Scope: (--- 1 k _ <br /> <br />5,, , '90(104) L ----)(- <br />WP#: -5 so 5-1, Scope: 2- 31 1 k9of 1 L -Y <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />contamination present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist