My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0543966
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 1:29:08 PM
Creation date
6/14/2021 11:29:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543966
PE
2960
FACILITY_ID
FA0025009
FACILITY_NAME
WELL DESTRUCTION ACTIVITIES
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449003
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylor McMillan's Well Service <br />12302 Andes Ave. Bakersfield CA, 93312 <br />Phone: (916) 761-5224 Email: mcmi1lans521@gmail.com <br />Website: www.wellblaster.com <br />Date: January 25, 2019 <br />BLASTING WORK PLAN <br />Well: MW-2 <br />Casing 2 -inch ID PVC to 20 feet <br />Location: 575 W. Grant line Road <br />Tracy, CA <br />Former Chevron Station 9-8632 <br />Plan date and time : Pending <br />GI. <br />Boosters <br />Density g/cc <br />Detonation Velocity <br />Casing Diameter <br /> <br />1.55 g/cc <br /> <br />24,000 ft/s <br /> <br />2 inches <br />7,315 m/s <br />4-- Sealing pipe <br />Charge Wt. 0.15 Kg 150 gams <br />feet 4 Detonator placed at 5 <br />10 ' Detonation pressure 207 k/bar <br />Total energy ea. 13,997 k/bar <br />Pressure at casing 3,341.48 k/bar 50,018,545 psi <br />Detonating Cord Pressure at 10 feet 0.00 29 psi <br />Start 5 feet <br />20' Intervals Linear Explosive Cord <br />End 20 feet Density g/cc 1.60 g/cc <br />Strength 25 grain Detonation Velocity 22,000 ft/s 6,706 m/s <br />Total 15 feet Casing Diameter 2 inches <br />Grains 25 gr/ft 1.62 g/ft <br />Detonation pressure 180 k/bar <br />Total energy pef ft. 11 k/bar <br />Pressure at casing 3.48 k/bar 52,062 psi <br />*These are estimated pressure for a empty well <br />Site procedure <br />Check site and measure well depth <br />Clear work site of all unessential personal <br />Lower charges and drop pipe into the well <br />Pump sealing material to top of well <br />Check and clear blast area (sound blast warning) <br />Arm explosives <br />Confirm area clear (final blast warning) <br />Detonate charge <br />Check hole and sound all clear <br />Refill cement to top of well to form a mushroom cap <br />70' <br />80' <br />Total Explosives <br />.0525 lbs. <br />Name of Blaster Preparing Plan: Tylor McMillan <br />*Tylor McMillan's Well Service reserves the right to change or modify the blast plan in <br />any way necessary to maintain the safety of all personnel onsite and in surrounding <br />areas. <br />40' <br />50' <br />60' <br />90'
The URL can be used to link to this page
Your browser does not support the video tag.