My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0543966
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 1:29:08 PM
Creation date
6/14/2021 11:29:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543966
PE
2960
FACILITY_ID
FA0025009
FACILITY_NAME
WELL DESTRUCTION ACTIVITIES
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449003
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br />,___, SITE LOCATION: Lc---- 7s-- 1.1,111 4 , 4 I__ ,....,... kJ , v ,--e-i , ,,,-, . 0 v FA#: 007.4-43 7 la PR# 054,2_14732 ~ <br />DATE ACTIVITY INITIAL <br />/ S Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. /,4-1 #L,-, <br />Provide MFR MFR to Accounting to ensure project has a ltA# and a PR#. The PR# for a <br />17 (' <br />1 ') <br />project does not change. If the lead agency changes, a new PR# must be created under <br />the existing FA. <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />IN 1/ 1 ali' <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />i no permit form has been submitted, record the information on a golden rod Service <br />Ptequest form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />1_,)( <br />3 1 igl o Work Plan SR#: op -1% si,s-- L -X <br />ki'11/to Review Work Plan to ensure scope of work matches the scope of work approved by <br />the lead agency and that the mw construction/destruction meets SJC Ordinance Code <br />and well standards. <br />L x <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />1 0 <br />project, and obtain a WP#. Use this WP# on DAR to track time spent in the field for the <br />specific mw/boring activity specified on the permit. L <br />‘) 1)L1 <br />WP#: <br />(9 0 3 11 ce) Scope: c s-vii <br />1.% <br />L ---Y. <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Environmental Assessment Projects -Review report to determine if <br />contamination was found. If contamination present, print out a 5021 and request a <br />new PR# be issued under PE 2960. Provide 5021 to Accounting Office for <br />processing. Complete a Prop 65 Notification. Send notification letter to CVRWQCB. <br />END Lead Oversight Projects -Review report to determine next phase of work to <br />be conducted or if closure is appropriate. Complete Prop 65 for any new <br />contaminants found at the site. <br />Other Lead Agency Projects -Review report to determine if any immediate public <br />health issues are found. If public health concerns are found, notify supervisor <br />immediately for follow up and further notifications. Complete Prop 65 for any new <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized. <br />EHD-29 8/15/17 <br />Site Mitigation Program Checklist
The URL can be used to link to this page
Your browser does not support the video tag.