Laserfiche WebLink
./' 7 A anda Magee, P. . <br />Senior Geologist <br />VI7G, <br />Matthew Baffin <br />Associate Scientist <br />JAFFREY & <br />AIJCL N1E <br />I I. 30. le <br />NO. 7816 <br />DATA GAP ASSESSMENT WORK PLAN AND PATH TO CLOSURE REVIEW <br />Chase Chevrolet, 424 N. Van Buren Street <br />Limitations and Certification <br />January 2, 2018 <br />6.0 LIMITATIONS AND CERTIFICATION <br />This document entitled Data Gap Assessment Work Plan and Path to Closure Review was <br />prepared by Stantec Consulting Services Inc. ("Stantec") for the account of the City of Stockton <br />(the "Client"). Any reliance on this document by any third party is strictly prohibited. The material <br />in it reflects Stantec's professional judgment in light of the scope, schedule and other limitations <br />stated in the document and in the contract between Stantec and the Client. The opinions in the <br />document are based on conditions and information existing at the time the document was <br />published and do not take into account any subsequent changes. In preparing the document, <br />Stantec did not verify information supplied to it by others. Any use which a third party makes of <br />this document is the responsibility of such third party. Such third party agrees that Stantec shall <br />not be responsible for costs or damages of any kind, if any, suffered by it or any other third party <br />as a result of decisions made or actions taken based on this document. <br />Prepared By: Reviewed By: <br />Information, conclusions, and recommendations provided by Stantec in this document have <br />been prepared under the supervision of and reviewed by the licensed professional whose <br />signature appears below. <br />Name: Jaff Auchterlonie, P.G. Signature: <br />Principal Geologist <br />Date: January 2, 2018 Stamp: <br />c. Mr. Doug Bojack, City of Stockton (via email to doug.boiack@stocktonca.aov) <br />Stantec <br />bin \ \us1312- <br />f02\workgroup \ 1857 \active \ 185703766 \ 05_report_deliv \ deliverable \work_plan \185703766_20180102_424_van_buren_work_plan_final.docx 6.1