My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
108
>
2900 - Site Mitigation Program
>
PR0544303
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:27 AM
Creation date
6/14/2021 11:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544303
PE
2950
FACILITY_ID
FA0025182
FACILITY_NAME
NAVARRA FAMILY PROPERTIES
STREET_NUMBER
108
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
235173200
CURRENT_STATUS
01
SITE_LOCATION
108 E ELEVENTH ST
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdvancedGeo <br />Environmental <br />28 March 2019 <br />AGE Project No. 19-4669 <br />Page 3 of 6 <br />hard hat <br />steel-toed boots <br />Level D: half-faced respirator (if necessary) <br />gloves <br />safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Daniel Villanueva Oversee operations, collect samples <br />FIELD CREW: TASK: <br />Rick Marty / Keith Lindgren Drill, collect samples, advance boring <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work. <br />7.0. COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used: <br />Hand gripping throat: Out of air; cannot breath <br />Grip partner's wrist or both hands around <br />waist: <br />Leave area immediately <br />Hands on top of head: Need assistance <br />Thumbs up: OK; I am alright; I understand <br />Thumbs down: No; negative
The URL can be used to link to this page
Your browser does not support the video tag.