Laserfiche WebLink
San Joaquin County Environmental Checklist <br /> Environmental Factors Potentially Affected: <br /> The environmental factors checked below would potentially be affected by this project(i.e.,the project <br /> would involve at least one impact that is a"Potentially Significant Impact"),as indicated by the checklist <br /> on the following pages. <br /> Aesthetics <br /> 11 Agricultural Resources ® Air Quality <br /> Biological Resources r] Cultural Resources Geology/Soils <br /> Hazards and Hazardous Materials Hydrology/Water Quality F] Land Use/Planning <br /> Mineral Resources ® Noise Population/Housing <br /> Public Services F1 Recreation ® Transportation/Traffic <br /> Utilities/Service Systems Mandatory Findings of Significance <br /> Determination t `NOr p° <br /> On the basis of this initial evaluation: <br /> I find that the proposed project COULD NOT have a significant effect on the environment,and a <br /> NEGATIVE DECLARATION will be prepared. <br /> I find that although the proposed project could have a significant effect on the environment,there will <br /> not be a significant effect in this case because revisions to the project have been made by or agreed to <br /> by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. <br /> ® I find that the proposed project MAY have a significant effect on the environment,and an <br /> ENVIRONMENTAL IMPACT REPORT is required. <br /> F] I find that the proposed project MAY have an impact on the environment that is"potentially <br /> significant"or"potentially significant unless mitigated,"but at least one effect(1)has been <br /> adequately analyzed in an earlier document pursuant to applicable legal standards and(2)has been <br /> addressed by mitigation measures based on the earlier analysis,as described on attached sheets. An <br /> ENVIRONMENTAL IMPACT REPORT is required,but it must analyze only the effects that remain <br /> to be addressed. <br /> I find that although the proposed project could have a significant effect on the environment,because <br /> all potentially significant effects(a)have been analyzed adequately in an earlier <br /> ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION pursuant to applicable <br /> standards and(b)have been avoided or mitigated pursuant to that earlier ENVIRONMENTAL <br /> IMPACT REPORT or NEGATIVE DECLARATION,including revisions or mitigation measures <br /> that are imposed upon the project,nothing further is required. <br /> i <br /> Signature Date <br /> alaadik- 6-"o-m be✓ bym <br /> Printed Name For <br /> Notice of Preparation for the June 2006 <br /> North County Recycling Center and Sanitary Landfill 2.3 <br /> AS 06307.06 <br /> Permit Revision <br />