Laserfiche WebLink
p'2 1nwnv:. ' SA NsJ 0 A Q U I N Environmental Health Department <br /> C O U N T Y--- Jasjit Kang, REHS, Director <br /> Muniappa Naidu, REHS,Assistant Director <br /> ��z,FoaaP Greatness grows here. <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng. REHS <br /> Steven Shih, REHS <br /> Michelle Henry, REHS <br /> June 8th, 2022 Elena Manzo, REHS <br /> To: San Joaquin County Community Development Department <br /> Attention: Stephanie Stowers <br /> From: Aldara Salinas (209) 616-3019 <br /> Environmental Health Specialist <br /> RE: PA-2100114 (SA), Referral, S00014239 <br /> 3334 W. Eleventh St., Tracy ' <br /> t <br /> The following requirements have been identified as pertinent to this project. Other requirements may also <br /> apply. These requirements cannot be modified. <br /> 1. Applicant shall contact Robert McClellon, Program Coordinator, Small Public Water System <br /> Program, at (209) 468-0332, to determine if the existing well can be permitted as a public water <br /> system prior to issuance of building permits. If a public water system is required, applicant shall <br /> submit a Small Public Water System preliminary technical report to the California State Water <br /> Resources Control Board, Division of Drinking Water (Water Board) at least six months before <br /> initiating construction of any water related improvement, as defined. The issuance of a permit to <br /> operate a small public water system by the local primacy agency (EHD) is prohibited without the <br /> concurrence of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br /> Drinking Water at (209) 948-3963 concerning the requirements for preliminary technical report <br /> submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, a <br /> permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to issuance of building permits. To issue a permit to operate, concurrence from <br /> the Water Board is required. A yearly permit to operate a public water system will be required by <br /> the EHD prior to sign off of the certificate of final occupancy (San Joaquin County Development <br /> Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br /> 2. A soil suitability and nitrate loading study incorporating proposed staff and customer use shall be <br /> submitted to the Environmental Health Department, indicating that the area is suitable for septic <br /> system usage. The studies must be approved by the Environmental Health Department prior to <br /> issuance of building permit(s). (San Joaquin County Development Title, Section 9-1105.2(d)). The <br /> fee will be based on the current schedule at the time of payment. <br /> The sewage disposal system shall comply with the onsite wastewater treatment systems <br /> standards of San Joaquin County prior to approval. A percolation test conducted in accordance <br /> with the E.P.A. Design Manual - Onsite Wastewater and Disposal Systems is required for each <br /> parcel. The fee will be based on the current schedule at the time of payment. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />