Laserfiche WebLink
vs@southbayguniteinc.com <br /> Scheduling <br /> (Excavation, Rebar, Plumbing) <br /> Bill Boucher <br /> Direct: 408-472-5411 <br /> scheduler@southbayguniteinc.com <br /> Office Manger <br /> (Insurance Certificates/HR) <br /> Joel Segovia <br /> Office: 408-362-9553 EXT: 7278 <br /> office@southbayguniteinc.com <br /> President <br /> Gus Rodriguez <br /> Office: 408-362-9553 EXT: 7276 <br /> gus@southbayguniteinc.com <br /> On 2021-11-04 3:57 pm, Robert Lopez [EHD] wrote: <br /> Gustavo Rodriguez <br /> I have reviewed the CERS submittal and compliance status and have found the following issues: <br /> • Violation #5, the hazardous materials inventory is not complete/accurate. <br /> 1. Portland cement - the silo of cement has not been reported. <br /> 2. Diesel exhaust fluid - the two 275 gallon totes have not been reported. <br /> 3. Diesel fuel No. 2 - the days on site element has not been completed. <br /> • Violation #6, the site map does not show or address the following: <br /> 1. North orientation. <br /> 2. Loading areas. <br /> 3. Internal roads. <br /> 2 <br />