My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1661
>
1900 - Hazardous Materials Program
>
PR0546987
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 1:19:50 PM
Creation date
6/22/2021 9:47:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0546987
PE
1921
FACILITY_ID
FA0026626
FACILITY_NAME
SOUTH BAY GUNITE EXCAVATION AND STEEL
STREET_NUMBER
1661
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1661 EL PINAL DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample <br /> Employee Training Sign In Sheet <br /> The following topics have been addressed: <br /> 1. Emergency Response/Contingency Plan training. <br /> 2. Spill notification procedures. <br /> 3. Spill response procedures. <br /> 4. Evacuation procedures. <br /> Printed , Z nayym�� i e Signature Date <br /> i <br /> /Lc, -ka,i ✓ri d a r♦ Zs In <br /> Business plans shall include provisions for ensuring that appropriate personnel receive initial and annual <br /> refresher training.All employees shall be trained in safety procedures in the event of a release or <br /> threatened release of a hazardous material, including, but not limited to,familiarity with the following <br /> plans and procedures: <br /> (A) Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency. <br /> (B) Procedures for the mitigation of a release or threatened release to minimize any potential harm or <br /> damage to persons, property,or the environment. <br /> (C) Evacuation plans and procedures, including immediate notice,for the business site. <br /> This training shall be documented electronically or by hard copy and shall be made available for a <br /> minimum of three years. <br /> Immediately provide employee training for appropriate personnel and submit a copy of the training <br /> records to the EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.