Laserfiche WebLink
Ross Robert Truck Repair Used Oil Tank <br /> Interim Assessment and Conditional Certification <br /> September 14, 2021 <br /> Integrity Assessment Inspection Checklist (cont'd.) <br /> Site Sketch Include tank,piping,drain,valves,monitor,building <br /> Air Line to Pump <br /> Wall <br /> Normal Vent 5"Port,capped <br /> Q O <br /> Qr Unused Pump 04 Emergency Vent <br /> 36.5" <br /> 30" Diaphragm Pump <br /> Q Uncapped Port <br /> Q 4 Uncapped Port <br /> IF <br /> 60" I <br /> 63" 01 <br /> Top View <br /> 40" <br /> 37.5" <br /> IF IF <br /> Side View <br /> 6 <br />