Laserfiche WebLink
S A N J O a Q U I N Environmental Health Department <br /> — C 0 j :V y <br /> Swimming Pool Official Inspection Report <br /> Facility Name and Address: AMBLERS CLUB, 3128 COUNTRY CLUB BLVD, STOCKTON 95204 <br /> #10 Disinfectant Residual <br /> OBSERVATIONS:Free chlorine level was low at 0.4 ppm (pool was currently closed and was not going to reopen until <br /> tomorrow). Member added 4 gallons of liquid chlorine. Make sure to keep this level at 1.0-10.0 ppm at all times. <br /> CALCODE DESCRIPTION:Public pools, when open or in use,shall be disinfected continuously by approved chemicals and shall maintain <br /> the following concentrations: 1.0 ppm to 10.0 ppm free chlorine without cyanuric acid, 2.0 ppm to 10.0 ppm free chlorine with cyanuric acid <br /> or 2.0 ppm bromine. Spas, wading pools,and spray grounds shall maintain the following concentrations:3.0 ppm to 10.0 ppm free <br /> chlorine or 4.0 ppm bromine. (CCR 65529) <br /> #14 Chemical Water Test Kit <br /> OBSERVATIONS:New test kit is an OTO. Future kits shall be DPD. <br /> CALCODE DESCRIPTION:Pool operator shall maintain a test kit for measuring the disinfectant residual, combined chlorine,pH,and <br /> cyanuric acid(if used)at the pool. Test kit shall be available at all times the pool is in use. Chlorine and bromine test kits shall be DPD <br /> type. Chlorine test kits shall be capable of testing for free and total chlorine,so that combined chlorine concentrations can be determined. <br /> (CCR 65529) <br /> #15 Operation Records <br /> OBSERVATIONS:Current pH and chlorine readings are not being recorded. Start today. <br /> CALCODE DESCRIPTION:Pool operator shall test the disinfectant residual,pH, and spa water temperature a minimum of once per day. <br /> Cyanuric acid concentration shall be tested once per month if cyanuric acid is used. Combined chlorine shall be tested as often as <br /> necessary to maintain the concentration below 0.4 ppm. Pool operator shall maintain written records of all maintenance and test results <br /> for at least two years and shall submit those records to the enforcement agency upon request. (CCR 65523) <br /> #36 Pressure and Vacuum Gauges <br /> OBSERVATIONS:Effluent gauge is missing on the return line. Install new one by 1 week. <br /> CALCODE DESCRIPTION:Pressure and vacuum gauges shall be provided for each pump system. (CBC 31258) <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> OBSERVATIONS <br /> Flow rate: 160 gpm Chlorine: 0.4 ppm Temp: ° F <br /> Cyanuric acid: 0 ppm pH: 7.4 Combined chlorine: 0 ppm <br /> NOTES <br /> Influent 12-12-4-16 <br /> Effluent? <br /> For pool access contact Bob Stanley at 329-4046 or Joe Sullivan atjoesullivan12@comcast.net <br /> FA0001761 PR0360307 SCO01 06/15/2021 <br /> EHD 36-01 Rev.09/16/2020 Page 2 of 3 Swimming Pool OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />