Laserfiche WebLink
The following is an itemized list of hazardous materials violations that have not been <br /> addressed for PACE SUPPLY CORP as of November08 , 2021 . <br /> Open violations from June 16 , 2021 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #6 - Failed to electronically submit a site map with all required content. <br /> OBSERVATION: A site map was not completed and submitted as part of the business plan . <br /> REGULATION GUIDANCE: A site map shall contain a north orientation , loading areas , internal roads , adjacent <br /> streets , storm and sewer drains , access and exit points , emergency shutoffs , evacuation staging areas , hazardous <br /> material handling and storage areas , and emergency response equipment. <br /> If a site map element is not applicable for your facility then list it on the map and label as " NA" . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS ) at <br /> http : //cers. calepa . ca . gov/, upload the correct or updated information , and submit to the EHD for approval . <br /> ❑ This violation was corrected 11This violation will be corrected by ( date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #12 - Failed to have the HMBP readily available to facility or EHD personnel . <br /> OBSERVATION Facility could not provide the Emergency Response Plan and the inventory information upon <br /> request. <br /> REGULATION GUIDANCE: The emergency response plans and procedures , the inventory of information required <br /> by this article , and the site map required by this section shall be readily available to personnel of the business or the <br /> unified program facility with responsibilities for emergency response or training pursuant to this section . <br /> CORRECTIVE ACTION : Immediately make arrangements to have the business plan readily available for review. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 2 of 2 <br />