My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014249
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
14250
>
2600 - Land Use Program
>
PA-2100129
>
SU0014249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 3:34:49 PM
Creation date
6/25/2021 10:53:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014249
PE
2631
FACILITY_NAME
PA-2100129
STREET_NUMBER
14250
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20305029
ENTERED_DATE
6/22/2021 12:00:00 AM
SITE_LOCATION
14250 S JACK TONE RD
RECEIVED_DATE
2/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & E/actric Company <br /> 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc.that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 72. Pip¢lina Marker Signs: PG&E n¢¢ds to maintain pip¢lin¢ marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PGSE Pipeline Services, an existing PGB�E pipeline marker sign <br /> that is in dir¢ct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> compl¢t¢. <br /> 13. PG&E is also th¢ provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PGS.E's facilities must be reviewed and <br /> approved by PGS.E to ensure that no impact occurs which may endanger th¢safe op¢ration of ' <br /> its facilities. <br /> P GS�.E Gas and Electric Fa duties Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.