Laserfiche WebLink
Pacific Gas and <br /> 4 � E/acfric Company <br /> 8. Streets and Roads: Access to facilities must ba maintained at all times. Street lights may ba <br /> allowed in the fee strips) and/or easements) but In all cases must be reviewed by PGBE for <br /> proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible. Road intersections will not ba allowed within the transmission easement. <br /> 9. Pipelines: Pipelines may ba allowed provided crossings era held to a minimum and to be as <br /> nearly perpendicular as possible. Pipelines within 25 feet of PGBE structures require review by <br /> PGBE. Sprinklers systems may b¢allowed; subject to review. Leach fields and septic tanks era <br /> not allowed. Construction plans must be submitted to PGBE for review and approval prior to the <br /> commencement of any construction. <br /> 10. Signs: Signs are not allowed except in rare cases subject to individual review by PGBE. <br /> 11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br /> trucks (pickups, vans, ¢tc.) may be allowed; subject to review of plans. Heavy equipment <br /> access to PGBE facilities is to be maintained at all times. Parking is to clear PGBE structures by <br /> at least 1 O feat. Protection of PGBE faciliti¢s from vehicular traffic is to ba provided at <br /> developer's expense AND to PGBE specifications. <br /> 12. Construction Activity: Since construction activity will take place near PGBE's overhead <br /> electric lines, please be advised it is the contractor's responsibility to b¢ aware of, and observe <br /> the minimum clearances for both workers and ¢quipmant operating near high voltage electric <br /> lines sat out in the High-Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety (httos://www.d ir.ca.eov/Title8/s65 e2.hi nil), as well as any other safety regulations. <br /> Contractors shall comply with California Public Vtilities Commission General Order 95 <br /> (htto://www.cot c ca.evv/eos/GO95/eo 95 s�uriu� oaea.btn�l) and all other safety rules. No <br /> construction may occur within 25 feat of PGBE's towers. All excavation activities may only <br /> commence after 811 protocols has been followed. <br /> Contractor shall ensure the protection of PGBE's towers and poles from v¢hicular damage by <br /> (installing Protective barriers) Plans for protection barriers must be approved by PGBE prior to <br /> construction. <br /> 13. PGBE is also the owner of distribution facilities throughout many of the areas within th¢ <br /> state of California. Therefore, any plans that impact PGBE's facilities must be reviewed and <br /> approved by PGBE to ensure that no impact occurs that may endanger the safe and reliable <br /> operation of its facilities. <br /> PGSLE Gas and Electric Facilities Page 6 <br />