My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:28:43 AM
Creation date
6/28/2021 11:18:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6: APPLY GREASE TO DROP TUBE <br />Apply black moly grease to the inside diameter of the <br />upper drop tube. Make sure coverage is completely <br />around the tube as shown in Figure 6. <br />Figure 6 <br />STEP 7: APPLY GREASE TO POLYPAK SEAL <br />Ensure that the polypak seal is installed on the inlet <br />tube with the lip up as shown in Figure 7. Apply black <br />moly grease to the polypak as shown. Make sure cover- <br />age is completely around the polypak seal. <br />Inlet <br />Tube <br />Figure 7 <br />Ensure polypak <br />lip is up <br />Polypak � �;' <br />- <br />��'F'`�—Apply grease <br />around polypak <br />STEP 8: INSTALL INLETTUBE <br />Insert the inlet tube into the upper tube until the upper <br />tube seats against the flange on the inlet tube. Ensure <br />polypak is inserted evenly and stays in inlet tube <br />groove. <br />Figure 8 <br />Um <br />NAR 2019 <br />ENV[HQNM;EiNTAL HEAL71.1 <br />DEPART //ENT <br />NOTE: Testable inlet tube must have cable port in <br />linewith float. Testable inlet tube bottoms out on <br />stop, it does not bottom out on inlet flange. See Fig- <br />ure 8A <br />Cable port must be in <br />line with float <br />'figure 8A <br />astable Models Only <br />SEE PAGE 8 FOR INSTRUCTIONS USING THE 71 SO - <br />TOOL. <br />SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOLC. <br />SEE PAGE 10 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOLCT. <br />Note: testable 71 SO models ending with a "T" require the <br />71 SO-TOOLCT or modified 71 SO -TOOL or 71 SO- TOOLC <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.