My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:28:43 AM
Creation date
6/28/2021 11:18:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13: DIMPLE FIRST HOLE <br />Remove tool. Remove any chips or burrs from the drill- <br />ing operation. Place the assembly on a solid surface. <br />Using the punch supplied with the 71 SO -TOOL, 71 SO- <br />TOOLC, and 71 SO-TOOLCT, align the tip of the punch <br />with the drilled hole and dimple the upper drop tube by <br />striking the punch with a hammer until the drop tube is <br />formed into countersunk hole in the inlet tube. After <br />punching, remove any chips that may have fallen into <br />the inlet tube screw hole. <br />Figure 13 <br />STEP 14: ASSEMBLE FIRST SCREW <br />Ensure that the drop tube was formed into the counter- <br />sunk screw hole as shown in Figure 14 if not return to <br />Step 13. Apply black moly grease to screw and tighten <br />first screw into inlet tube with a screwdriver. Use only <br />the taptite screws that are supplied with the unit. Seat- <br />ing torque is 20 indlos min. to 35 indbs max. Screw head <br />should be flush with the drop tube. Do not over tight- <br />en. <br />Figure 14 <br />STEP 15: DIMPLE REMAINING HOLES <br />Remove any chips or burrs from the drilling operation. <br />Dimple the next (2) holes as done in Step 13. Make sure <br />the assembly is on a solid surface when punching. After <br />punching, remove any chips that may have fallen into <br />the inlet tube screw hole. <br />Align punch with i�-> <br />drilled hole <br />Figure 15 <br />STEP 16: ASSEMBLE OTHER SCREWS <br />Apply black moly grease to screws and tighten the oth- <br />er (2) screws into inlet tube with a screwdriver as done <br />in Step 14. Use only the taptite screws that are supplied <br />with the unit. Seating torque is 20 indbs min. to 35 in- <br />Ibs max. Do not over tighten. <br />STEP 17: APPLY GREASE TO LOWER O-RING AND <br />BODY THREADS <br />Apply black moly grease to the lower tube o -ring and <br />body threads as shown. Make sure coverage is com- <br />pletely around the o -ring. Install o -ring in groove just <br />above threads. <br />Apply grease <br />around o -ring <br />O-ring <br />groove Body threads <br />Figure 17 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.