My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:28:43 AM
Creation date
6/28/2021 11:18:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY, FOR STANDARD MOD- <br />ELS, PROCEED TO NEXT PAGE. <br />STEP 1T: INSTALL SOCKET ADAPTOR ASSY <br />Put cable thru threads in inlet tube and out thru cable <br />port on side of inlet tube. Thread the socket adaptor <br />assembly finger tight into the inlet tube. Note: theca- <br />ble <br />heca- <br />ble port on the inlet tube must be in line with the float <br />as shown previously in Figure 8A. <br />Socket <br />adaptor <br />assembly <br />port <br />Figure 7T <br />STEP 2T: PASS CABLE THRU FERRULE <br />Pass cable thru ferrule. Loop cable and then pass cable <br />back thru ferrule. Keep ferrule loose until cable length <br />is determined in the next step. Note: if cable end frays <br />it may be necessary to trim the cable again to pass thru <br />ferrule. <br />1/8"mandrel <br />rivet <br />Ferrule <br />Trim <br />cable � <br />after <br />step 3T Loop <br />Figure 2T <br />STEP 3T: DETERMINE CABLE LENGTH <br />Run cable along upper tube and over the top plate on <br />the float bracket as shown. With the float in the down <br />position (as shown in Figure 3T) align loop in cable with <br />rivet and top hole in float bracket. Use the rivet as a <br />template to size the loop in the cable and pull cable <br />tight and crimp ferrule with crimping tool / pliers onto <br />cable at this location. Trim excess cable with wire cut- <br />ter / scissors. For reference, from the seam where the <br />upper tube and valve body meet to the end of the cable <br />after trimming will require approximately 3.5" of cable. <br />Se <br />C-ahlP nvPr float hracket <br />Figure 3T <br />STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br />Ensure cable is over the float bracket. Using the sup- <br />plied rivet align loop in cable with top hole in float <br />bracket and pass rivet thru cable loop and float bracket <br />hole. Using rivet tool for 1/8" dia mandrel attach rivet <br />anI cable to the float bracket. See last page for list of <br />replacement cable parts. <br />Figure � <br />STEP 5T: ENSURE PROPER CABLE OPERATION <br />Unthread the socket adaptor assembly from the inlet <br />tube and ensure float and poppet move freely when <br />socket adaptor assembly is pulled on. It should only <br />require 3" to 4" of movement in order to actuate the <br />at and poppet. Thread socket adaptor assembly fin- <br />ger tight into inlet tube after testing. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.