Laserfiche WebLink
Vapor Recovery <br />OPW <br />Ball Float <br />Tube Cut <br />per Loca I <br />Requireme <br />6' <br />Fill Riser <br />14" Minimum <br />Clea rance for <br />Float <br />.— Align Float Along Length of Tank —� S� <br />Figure 24 Pi <br />A <br />orient socket <br />Figure 24A <br />aptor be- <br />een jack <br />rew bolts <br />FOR TESTABLE MODELS ONLY: Check installation <br />again as done in Step 23 to ensure poppet actuates and <br />resets properly. See page 17 for full testing details. Ap- <br />ply pipe dope to the socket adaptor threads. Pipe dope <br />should be a non -hardening gasoline resistant pipe <br />thread seal compound. Install socket adaptor and <br />torque to 3.5 ft-Ibs (42 in -lbs) minimum to 5.0 ft -lbs (60 <br />in -lbs) maximum. After installing socket adaptor where <br />required, pressure test testable overfill valve per CARB <br />TP201.1 D to ensure valve is vapor tight. <br />15 <br />