Laserfiche WebLink
Quail Village HOA <br />Pool Remodel <br />Page 2 <br />The following changes have been made to the plans according to Glen at Pool <br />Solutions: <br />1. Pool filter changed from TR -100 sand to a 520 square ft. cartridge filter. <br />2. Pool pump changed from a 2 HP Whisperflo to a Variable Speed Pentair. <br />3. Return lines to be changed from 2 -inch PVC to 2-1/2 inch PVC. <br />The above changes are approved by the EHD. <br />Any item(s) inadvertently overlooked on the plan check may be cause for re -construction <br />at the pool. This Department requires a pre-gunite (with plumbing exposed), pre -plaster, <br />and final inspection prior to approving pool to open. Call me to set up an inspection at <br />(209) 468-3438. <br />Jeff Carruesco, REHS Program Coordinator <br />San Joaquin County Environmental Health Department <br />t�. <br />