Laserfiche WebLink
U <br /> JZ,^^ <br /> V <br /> PLUMBING SPECIFICATIONS -it <br /> 0 PART I - GENERAL PLUMBING LEGEND o z <br /> Zp <br /> co ui <br /> A. CONDITIONS " <br /> SYMBOL DESCRIPTION SYMBOL DESCRIPTION (858) 733-2445 <br /> 1 GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIAL CONDITIONS, AND OTHER 2. SHOP DRAWINGS: D. CLEANOUTS <br /> z RELATED PORTIONS OF DIVISION I APPLY TO THIS SECTION. INCLUDE DETAILED DRAWINGS WHERE REQUIRED FOR PROPER COORDINATION WITH designed by: <br /> 2 OTHER TRADES. INDICATE EQUIPMENT LAYOUTS, ELECTRICAL CHARACTERISTICS, 1. INTERIOR FINISHED FLOOR AREAS (FCO): TWO PIECE BODY WITH DOUBLE DRAINAGE CD CONDENSATE DRAIN BALL VALVE EKATERINA KOHLWES <br /> B. SUMMARY OF WORK WIRING AND CONTROL DIAGRAMS, SIZES AND LOCATIONS OF PIPING, DUCTS, FLANGE, WEEP HOLES, REVERSIBLE CLAMPING COLLAR, AND ADJUSTABLE <br /> 0 CONDUITS, AND OTHER ITEMS WHICH EFFECT THE SPACE AVAILABLE. NICKEL-BRONZE, ROUND SCORIATED COVER IN SERVICE AREAS AND ROUND OR DOMESTIC COLD WATER L BUTTERFLY VALVE <br /> I. THE WORK INCLUDED IN THIS SECTION CONSISTS OF LABOR,MATERIALS, AND EQUIPMENT SUBMIT ITEMS AT ONE TIME IN A NEAT AND ORDERLY MANNER WITHIN 15 DAYS OF SQUARE WITH DEPRESSED COVER TO ACCEPT FLOOR FINISH IN FINISHED FLOOR AREAS. <br /> U NECESSARY FOR THE INSTALLATION OF A COMPLETE PLUMBING SYSTEM AS INDICATED AWARD OF CONTRACT. PARTIAL LIST WILL NOT BE ACCEPTABLE. SUBMITTALS (MATERIALS SPECIFIED UNDER PART 2, PARAGRAPH 5.) <br /> ON THE DRAWINGS AND AS DESCRIBED HEREIN. INSTALL SYSTEM IN PERFECT WORKING SHALL INCLUDE MANUFACTURER'S SPECIFICATIONS, PHYSICAL DIMENSIONS, WEIGHTS DOMESTIC HOT WATER GAS SHUT OFF VALVE REVISIONS: <br /> z ORDER AND IN FULL ACCORDANCE WITH THE INTENT AND MEANING OF THE DRAWINGS AND RATINGS OF EQUIPMENT SUBMITTED. SUBMITTALS SHALL BE INDEXED AND PART III - EXECUTION <br /> AND SPECIFICATIONS. THE WORK IN GENERAL CONSISTS OF FURNISHING AND INSTALLING SECURELY BOUND IN A SUITABLE MANNER. SUBMIT THE FOLLOWING ITEMS FOR DOMESTIC HOT WATER RETURN ANGLE VALVE <br /> z <br /> NEW PLUMBING FIXTURES AND TRIM INCLUDING CONNECTION OF NEW WASTE, VENT AND APPROVAL: 1) CLEANOUTS 2) PIPING AND FITTINGS 3) VALVES. NO DATE DESCRIPTION <br /> ° WATER PIPING TO EXISTING SERVICES AS REQUIRED TO PUT NEW FIXTURES INTO A. GENERAL <br /> 140 DOMESTIC HOT WATER (140° F) GLOBE VALVE <br /> U <br /> SERVICE. 3. RECORD DRAWINGS: 1. INSTALL MATERIALS AND EQUIPMENT IN AN ARRANGEMENT THAT WILL GIVE THE 140 DOMESTIC HOT WATER RETURN (140° F) MOTORIZED T.C. VALVE/2-WAY <br /> U) MAINTAIN ACCURATE RECORDS OF ANY CHANGES FROM THE CONTRACT <br /> W GREATEST PRACTICAL EASE OF OPERATION AND SERVICE TO THE OWNER. <br /> C. REGULATIONS, CODES, PERMITS AND INSPECTIONS DOCUMENTS AND SHOP DRAWINGS. UPON COMPLETION OF THE PROJECT, DELIVER -RCW RAW COLD WATERMOTORIZED T.C. VALVE/3-WAY <br /> TO THE OWNER ONE (l) SET OF LEGIBLE AND REPRODUCIBLE COPIES OF THESE 2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED <br /> Z I. COMPLY WITH NATIONAL, STATE, COUNTY, AND CITY CODES, ORDINANCES, ETC., HAVING RECORD DRAWINGS. INSTALLATION PROCEDURES. <br /> JURISDICTION, INCLUDING RULES AND REQUIREMENTS OF UTILITY SERVING AGENCIES. F FIRE PROTECTION PRESSURE REDUCING VALVE <br /> 0 4. WARRANTY: 3. PERFORM WORK IN ACCORDANCE WITH THE BEST TRADE PRACTICES. INSTALL <br /> 2. INCORPORATE CODES, ORDINANCES, ETC., INTO THE BASE BID AND INSTALLATION OF UNLESS SPECIFIED OTHERWISE BY ARCHITECT, ENGINEER, OWNER OR OWNER'S WASTE ABOVE GROUND SAFETY RELIEF VALVE <br /> MATERIALS AND EQUIPMENT SQUARELY WITH THE BUILDING LINES. PROVIDE RIGID <br /> WORK NO ADDITIONAL FUNDS WILL BE ALLOCATED FOR WORK REQUIRED TO CONFORM REPRESENTATIVE, UPON COMPLETION OF THE PROJECT, DELIVER TO THE OWNER A <br /> PERMANENT BASES AND SUPPORTS FOR WORK. CONSTRUCT AND BRACE EQUIPMENT, WASTE BELOW GROUND GATE VALVE <br /> TO REGULATIONS AND REQUIREMENTS OR TO OBTAIN APPROVAL OF WORK WRITTEN ONE (1) YEAR WARRANTY ON THE SYSTEMS,MATERIALS AND ALL WORK PIPING, ETC, SO THAT THERE WILL BE NO VIBRATION AND/ OR RATTLING WHEN THE <br /> PERFORMED, WHICH INCLUDES THE ENTIRE COST, INCLUDING MATERIALS AND/OR LABOR, SYSTEM IS IN OPERATION. <br /> Z 3. OBTAIN AND PAY FOR REQUIRED PERMITS AND LICENSES. WHEN REQUIRED BY CODE, OF CORRECTIVE WORK REQUIRED AND NECESSITATED BY DEFECTS IN MATERIALS VENT b SHUT-OFF VALVE IN RISER <br /> WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES. PRIOR TO FINAL AND/OR WORKMANSHIP. CONTRACTOR SHALL ALSO PRESENT THE OWNER w/ A COPY OF 4. COVER AND PROTECT EQUIPMENT AND MATERIALS FROM WEATHER, THEFT, ETC., UNTIL GW GREASE WASTE SWING CHECK VALVE <br /> U) APPROVAL,FURNISH ARCHITECT WITH CERTIFICATES OF INSPECTION AND APPROVALS ALL MANUFACTURER'S WARRANTIES THAT EXCEED THE WARRANTY PERIOD, SUCH AS DATE OF COMPLETION. PLUG AND/OR CAP OPEN ENDS OF INSTALLED PIPING. <br /> Z BY LOCAL AUTHORITIES. WATER HEATERS. AW ACID WASTE ABOVE GROUND �� BACKFLOW PREVENTER <br /> 0 4• IN ADDITION, THE LATEST ADOPTED EDITION OF THE FOLLOWING CODES AND PUBLISHED 5. OPERATION AND MAINTENANCE INSTRUCTIONS: B. INSTALLATION <br /> o UPON THE COMPLETION OF THE PROJECT, DELIVER TO THE OWNER THE REQUIRED 1. CONCEAL PIPING IN WALLS, FURRED SPACES, PIPE SPACES, OR A <br /> STANDARDS SHALL BE ADHERED TO: BOVE SUSPENDED <br /> AW ACID WASTE BELOW GROUND MANUAL FLOW BALANCINCx VALVE (CIRCUIT SETTER) <br /> NUMBER OF COPIES OF HARD BOUND O & M MANUALS. INCLUDE IN THE MANUAL CEILINGS, AS SHOWN ON THE DRAWINGS. GROUP PIPING WHEREVER PRACTICAL ANDT <br /> z A. 2019 CALIFORNIA BUILDING CODE (CIBC) INSTALL UNI <br /> C) INSTRUCTIONS PREPARED SPECIFICALLY FOR THE SYSTEMS PROVIDE, ALONG WITH AV ACID VENT DIAL THERMOMETER <br /> B. 2019 CALIFORNIA MECHANICAL CODE (CMC) DESCRIPTIONS, PARTS LIST, INSTRUCTIONS, AND WARRANTIES. START-UP REPORTS FOR UNIFORMLY IN STRAIGHT PARALLEL LINES, SQUARELY WITH BUILDING LINES. P <br /> -RDL ROOF DRAIN LEADER PRESSURE GAUGE W/ SNUBBER <br /> o C. NFPA STANDARDS ALL EQUIPMENT WILL BE DELIVERED WITH THE MATERIALS AND EQUIPMENT WILL BE 2. SUPPORT HORIZONTAL PIPING WITH PIPE HANGERS. DO NOT USE PERFORATED METAL <br /> D. ASHRAE HANDBOOKS DELIVERED WITH THE MATERIALS AND EQUIPMENT UTILIZED IN THE PROJECT. IDENTIFY TAPE. ARRANGE PIPING SO THAT THERMAL EXPANSION DOES NOT CAUSE STRESS. <br /> • E. SMACNA DUCT CONSTRUCTION STANDARDS EACH ITEM BY THE DESIGNATION APPEARING ON THE DRAWINGS. -ODL OVERFLOW DRAIN LEADER STRAINER <br /> INSTALL AND SECURE PIPING SO THAT HOT AND COLD LINES, AND LINES OF <br /> J F. 2019 CALIFORNIA PLUMBING CODE (CPC) DISSIMILAR METALS, ARE NOT IN CONTACT. G NATURAL GAS ""' FLEX CONNECTOR <br /> J G. 2019 CALIFORNIA ELECTRICAL CODE (CEC) <br /> z H. 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC) 6. OWNER TRAINING: 3. VERIFY EQUIPMENT DIMENSIONS AND REQUIREMENTS FOR ROUGH-IN WORK. BENDING OR -LPG LIQUIFIED PETROLEUM GAS (PROPANE) UNION <br /> I. 2019 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS AT A TIME DESIGNATED BY THE OWNER, PROVIDE A SUITABLE TECHNICIAN, MECHANIC OFFSETTING OF FINISHED PIPING CONNECTIONS AND "COCKING" OF FITTINGS OR TRIM WILL <br /> OR ENGINEER TO REVIEW THE SYSTEMS WITH OWNER'S REPRESENTATIVE TO NOT BE ACCEPTABLE. DO NOT SUPPORT ANY PIPING WEIGHT FROM EQUIPMENT. -MPG MEDIUM PRESSURE NATURAL GAS TEE UP <br /> o D. DESIGN DRAWINGS THOROUGHLY FAMILIARIZE HIM WITH THE OPERATIONS AND MAINTENANCE OF THE <br /> 1. DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED ONLY t0 DEFINE THE SYSTEMS. UP TO (8) EIGHT HOURS TOTAL TRAINING TIME SHALL BE REQUIRED WITHOUT 4. SANITARY: LAY PIPING AT A UNIFORM GRADE. MAKE JOINTS CLOSE AND SQUARE. USE -HPG HIGH PRESSURE NATURAL GAS TEE DOWN <br /> W BASIC FUNCTIONS REQUIRED. PROVIDE LABOR,MATERIAL, ETC.,NECESSARY t0 ADDITIONAL COST TO THE OWNER. PRIOR TO TRAINING THE OWNER SHALL HAVE TAKEN FITTINGS FOR TURNS AND OFFSETS. UNIFORMLY GRADE AND COMPACT TRENCHES PRIOR <br /> ACCOMPLISH THESE REQUIREMENTS. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE POSSESSION OF THE O & M MANUALS, AND SHALL HAVE HAD A REASONABLE AMOUNT TO LAYING PIPING. PROVIDE CONTINUOUS SUPPORT FOR PIPING. A COMPRESSED AIR ELBOW UP <br /> OF TIME FOR HIS PERSONNEL TO FAMILIARIZE THEMSELVES WITH THE CONTENTS OF THE <br /> o ANTICIPATED AND SHALL BE CONSIDERED A PART OF THE WORK INCLUDED. NO MANUAL 5. PIPING CONNECTIONS TO PLUMBING FIXTURES, EXPOSED PIPING AND FITTINGS SHALL BE V VACUUM ELBOW DOWN <br /> Z CHANGES THAT ALTER THE CHARACTER OF THE WORK WILL BE PERMITTED. DO NOT CHROME PLATED. <br /> o SCALE THE DESIGN DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS. N MEDICAL NITROGEN M WATER METER <br /> • 2• IF A CONFLICT OCCURS BETWEEN THE DESIGN DRAWINGS AND SPECIFICATIONS, 6. CUTTING AND PATCHING SHALL BE APPROVED BY THE ARCHITECT PRIOR TO <br /> PROMPTLY NOTIFY THE ARCHITECT AND/OR ENGINEER. AT THAT POINT, AN PART II - PRODUCTS PERFORMING THE WORK. N20 MEDICAL NITROUS OXIDE GAS METER <br /> INTERPRETATION WILL BE MADE BY THE ARCHITECT AND/OR ENGINEER AND SAID 7. INSULATE ALL PIPING CONVEYING FLUIDS ABOVE OR BELOW AMBIENT TEMPERATURES, -CO2 CARBON DIOXIDE WATER HAMMER ARRESTER (WHA) <br /> DECISION SHALL BE CONSIDERED PART OF THE CONTRACT DOCUMENTS. A. GENERAL PRODUCTS ALL CONDENSATE PIPING AND THE UNDERSIDE OF ROOF DRAINS/OVERFLOW ROOF <br /> I. SEISMIC RESTRAINTS: DRAINS AND THE UNDERSIDE OF HORIZONTAL RAINWATER PIPING. WHERE EXPOSED, (E) EXISTING PIPING HOSE BIBB, EXPOSED <br /> D E. QUALIFICATIONS OF CONTRACTOR AND WORKMEN COVER INSULATION WITH ALUMINUM JACKET. <br /> ° I. CONTRACTOR SHALL BE PROPERLY LICENSED TO PERFORM THE WORK. A. WHERE REQUIRED BY THE BUILDING OFFICIALS/BUILDING CODES,FURNISH AND DEMOLITION WORK D& HOSE BIBB, RECESSED <br /> Z INSTALL SEISMIC RESTRAINTS FOR PIPING, AND EQUIPMENT. SEISMIC RESTRAINTS C. TESTING REQUIREMENTS 1 4 <br /> SHALL BE DESIGNED TO RESIST SEISMIC FORCES PRESCRIBED IN THE BUILDING SLOPE DOWN IN DIRECTION OF FLOW AUTOMATIC AIR VENT <br /> w 2. USE SUFFICIENT JOURNEYMEN, CRAFTSMEN AND SUPERVISORS t0 ENSURE PROMPT, CODES FOR THE PROJECT LOCATION. 1. TEST SYSTEMS IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, UNIT <br /> PROPER, AND SAFE EXECUTION OF THE WORK. ORDINANCES, ETC. MINIMUM REQUIREMENTS ARE AS FOLLOWS: <br /> B. WHERE REQUIRED BY THE BUILDING OFFICIAL, PROVIDE STRUCTURAL r EQUIPMENT TAG (E) CONNECT NEW WORK TO EXISTING <br /> z CALCULATIONS SEALED AND SIGNED BY A LICENSED STRUCTURAL ENGINEER. UNIT <br /> F. BASE BID A. SANITARY: STATIC WATER PRESSURE FOR ONE (1)HOUR FLOW INDICATOR <br /> 0 2. FURNISH AND INSTALL NEW PRODUCTS OF ESTABLISHED AND REPUTABLE 5. POTABLE WATER: AVAILABLE PRESSURE FOR ONE (1) HOUR. AG DIAGRAM TAG <br /> 1• BASE BID SHALL INCLUDE MATERIALS AND EQUIPMENT SPECIFIED OR SCHEDULED ON MANUFACTURERS. SEE LIST OF ACCEPTABLE MANUFACTURERS ELSEWHERE IN THIS C. GAS PIPING: PRESSURE 14-INCH WATER COLUMN OR LESS, 10 PSI FOR ONE (1) HEET PIPE CAP <br /> 0 THE DRAWINGS. REQUESTS FOR SUBSTITUTION OF MATERIALS AND EQUIPMENT SHALL BE SPECIFICATION. MAKE NO EQUIPMENT SUBSTITUTIONS THAT WOULD LEAVE INADEQUATE HOUR. <br /> BY ADDITIVE OR DEDUCTIVE ALTERNATE BID ONLY, WITH THE FOLLOWING DATA OPERATING OR SERVICING SPACE. REFER TO SUBSTITUTION SECTION OF THE D. GAS PIPING: OVER 14-INCH WATER COLUMN, 60 PSI FOR ONE (1) HOUR. IN-LINE CIRCULATION PUMP Q <br /> J CLEARLY WRITTEN AT THE BEGINNING OF THE ALTERNATE PROPOSAL: SPECIFICATIONS. �� <br /> ci 2. IF ANY TEST SHOWS THE WORK TO BE DEFECTIVE IN ANY WAY OR AT VARIANCE WITH TRAP PRIMER 0 Z <br /> Z A. ADDITIVE OR DEDUCTIVE AMOUNT CLEARLY WRITTEN IN WORDS AND NUMERALS. SPECIFICATION REQUIREMENTS,MAKE NECESSARY CHANGES AND REMEDY DEFECTS. w <br /> � 3. ACCESSORIES REQUIRED FOR PROPER OPERATION OF THE SYSTEMS, EVEN THOUGH NOT <br /> B. INCREASED OR REDUCED CONSTRUCTION TIME IN DAYS. W <br /> SPECIFICALLY INDICATED, SHALL BE INCLUDED AND INSTALLED. SUCH ACCESSORIES PIPE BREAK R <br /> z C. OTHER DEMONSTRABLE BENEFIT,FOR WHICH THE SUBSTITUTION OF SUCH ITEM WILL MAY INCLUDE, BUT ARE NOT LIMITED TO,FILTERS, CONDENSATE DRAINS, RELIEF VALVES, 3. TEST PIPING SYSTEMS AFTER INSTALLATION AND PRIOR TO BEING PUT INTO USE, `J <br /> o BE IN THE OWNER'S INTEREST. SERVICE VALVES, AQUASTATS, VIBRATION ISOLATORS, ETC. STARTERS FOR COVERED OR CONCEALED BY INSULATION, BACKFILLING OR BUILDING CONSTRUCTION. w <br /> 0 NON-PREWIRED EQUIPMENT, I.E., FANS, PUMPS ETC., ARE UNDER THE ELECTRICAL O SUMP PUMP W <br /> W 2. ONLY THOSE MATERIALS AND EQUIPMENT WHICH ARE SUBMITTED AS AN ALTERNATE BID CONTRACTOR'S SCOPE OF WORK, UNLESS NOTED OTHERWISE. D. DISINFECTION OF DOMESTIC WATER PIPING SYSTEM J <br /> o AND WHICH ARE ACCOMPANIED BY THE SUPPORTING DATA INDICATED BELOW WILL BE O <br /> REVIEWED AND CONSIDERED. 1. DISINFECT WATER PIPING IN STRICT CONFORMANCE WITH THE REQUIREMENTS OF THE Cl) <br /> 0 <br /> 4. SPECIFIC REFERENCE TO A MANUFACTURER'S PRODUCT IS ONLY TO ESTABLISH TYPE, � TWO WAY GRADE GLEAN OUT <br /> z_ QUALITY, AND PERFORMANCE REQUIRED. THESE QUALIFICATIONS ARE IN ADDITION TO STATE OF CALIFORNIA "WATER SUPPLY REGULATIONS", SECTION 3 AND IN ACCORDANCE <br /> G. SUBSTITUTIONS THE REQUIREMENTS SHOWN ON THE PLANS AND ELSEWHERE IN THESE SPECIFICATIONS. TO ALL APPLICABLE PLUMBING CODES AND LOCAL AMENDMENTS ADOPTED BY THE FLOOR CLEAN OUT / CLEAN OUT TO GRADE W Z <br /> LISTING OF ALTERNATE EQUIPMENT MANUFACTURERS SHALL NOT BE CONSTRUED AS AN BUILDING DEPT.. HAVING JURISDICTION. IZ <br /> I. MATERIALS AND EQUIPMENT THAT ARE A SUBSTITUTE FROM THE LISTED MANUFACTURES UNCONDITIONAL APPROVAL OF THE PRODUCTS OF THOSE MANUFACTURERS. WALL CLEAN OUT 0 �/� <br /> MAY BE CONSIDERED. PRIOR TO PROPOSING ANY SUBSTITUTE ITEM, CONTRACTOR v J <br /> SHALL ( FACT, EQUAL THAT <br /> SPECIFIED, THAT SUCH TEM WILL FIT ITEM <br /> NTO INTO SPA E ALLOCATED, THAT SUCH ITEM B. PIPING MATERIALS FLOOR DRAIN Z Z <br /> ° AFFORDS COMPARABLE EASE OF OPERATION, MAINTENANCE AND SERVICE, THAT THE Z <br /> Z <br /> 1. SOIL, WASTE, AND VENT PIPING AND FITTINGS SHALL BE: FLOOR SINK Q O <br /> APPEARANCE, LONGEVITY, CAPACITY, SUITABILITY, AND ELECTRICAL CHARACTERISTICS <br /> U) ARE COMPARABLE, AND THAT BY REASON OF COST SAVINGS, REDUCED CONSTRUCTION NOTE: NOT ALL SYMBOLS <br /> o TIME, OR SIMILAR DEMONSTRABLE BENEFIT, THE SUBSTITUTION OF SUCH ITEM WILL BE IN A. CAST IRON,NO HUB. MAY BE USED OO ROOF / OVERFLOW DRAIN <br /> B. PLASTIC PIPE (WHERE ALLOWED BY THE CODE): Q <br /> Z THE OWNERS INTEREST. (I) PVC ASTM D2665-82. JOINTS: SOLVENT WELD ASTM D2564-80. LLJ <br /> I= U <br /> w (2)PENETRATION OF FIRE RESISTIVE CONSTRUCTION SHALL CONFORM TO THE <br /> 0 2. THE BURDEN OF PROOF OF EQUALITY OF A PROPOSED SUBSTITUTION FOR A SPECIFIED REQUIREMENTS OF ALL APPLICABLE BUILDING CODES AND LOCAL AMENDMENTS U <br /> ITEM SHALL BE UPON THE CONTRACTOR. CONTRACTOR SHALL SUPPORT HIS REQUESTADOPTED BY THE BUILDING DEPT.. HAVING JURISDICTION. W U_ <br /> o WITH SUFFICIENT TEST DATA AND OTHER MEANS TO PERMIT THE ENGINEER TO MAKE A U <br /> Z FAIR AND EQUITABLE DECISION ON THE MERITS OF THE PROPOSED SUBSTITUTION. - U <br /> o INSUFFICIENT SUBMITTAL DATA WILL RESULT IN REJECTION OF THE PROPOSED <br /> 2. WATER PIPING ABOVE GRADE: O w <br /> SUBSTITUTION. ANY ITEM BY A MANUFACTURER OTHER THAN THOSE SPECIFIED, OR OF A. COPPER TUBING: ASTM 888, TYPE L, HARD DRAWN. LL F- W N LU <br /> • BRAND NAME OR MODEL NUMBER, OR OF GENERIC SPECIES OCHER THAN CHOSE 5. FITTINGS: ANSI/ASME 51623, CAST BRASS, OR ANSI/ASME 816.29, WROUGHT COPPER. ~ D Z r <br /> SPECIFIED, WILL BE CONSIDERED A SUBSTITUTION. ENGINEER WILL BE THE SOLE JUDGE JOINTS: SOLDER AND FLUXES SHALL HAVE A LEAD CONTENT OF LESS THAN 02 OF 1 Z �r NW <br /> C. <br /> OF WHETHER OR NOT THE SUBSTITUTION IS EQUAL IN QUALITY, UTILITY AND ECONOMY TO PERCENT. w O � L0 <br /> Z THAT SPECIFIED. <br /> D 3. APPROVAL OF A SUBSTITUTION SHALL NOT RELIEVE CONTRACTOR FROM 3. COOLING COIL CONDENSATE DRAIN PIPING: W > U Z <br /> co <br /> � � <br /> RESPONSIBILITY FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE CONTRACT. J � Z M <br /> . COPPER TUBING: ASTM 8306, DWv. O 0 O <br /> 0 CONTRACTOR SHALL BEAR THE EXPENSE FOR ANY CHANGES IN OTHER PARTS OF THIS CID <br /> Z B. FITTINGS: ASME 16.23, CAST BRONZE, OR ASME 51629, WROUGHT COPPER <br /> WORK OR OTHER WORK CAUSED BY THE PROPOSED SUBSTITUTION, INCLUDING BUT NOT C. JOINTS: ASTM 532, SOLDER,GRADE 505. WHERE BRANCH DRAINS ARE SMALLER � W <br /> LIMITED TO STRUCTURAL, ELECTRICAL, PLUMBING, AND ACCESS REQUIREMENTS. <br /> o THAN AVAILABLE SIZES IN DWV, USE ASTM 588, TYPE M COPPER TUBING. O l_- W Y <br /> J CU Z) <br /> 4. IF ENGINEER REJECTS CONTRACTOR'S SUBSTITUTE ITEM ON THE FIRST SUBMITTAL, C fr O O J <br /> z_ CONTRACTOR MAY MAKE ONLY ONE ADDITIONAL REQUEST FOR SUBSTITUTION IN THE 4 WATER VALVES: G <br /> 0 <br /> SAME CATEGORY. - <br /> SHALL BE BY THE SAME MANUFACTURER WITH MANUFACTURER'S NAME AND L.L. lt W <br /> PRESSURE RATING CLEARLY MARKED ON OUTSIDE OF BODY. PROVIDE VALVES <br /> • H. SUBMITTALS SUITABLE TO CONNECT TO ADJOINING PIPE AS SPECIFIED FOR PIPE JOINTS. USE Z <br /> I. EQUIPMENT AND MATERIALS: PIPE SIZE GATE VALVES WITH RISING STEM OR BALL VALVES. VALVES SHALL Q <br /> J BE 125 0 GLASS. w ��� <br /> �'�,�3; j LUV° A. CONTRACTOR SHALL HAVE APPROVED SUBMITTALS PRIOR TO FABRICATION OR <br /> z <br /> U) <br /> DELIVERY OF ANY MATERIAL AND/OR EQUIPMENT TO THE JOB SITE. SUBMIT A C. PIPE SUPPORTS �' Frozen Yogurt,lce•CreamandMore... <br /> U) MINIMUM OF 8 (EIGHT) COPIES, COMPREHENSIVELY INDEXED SUBMITTALS IN A 1. SEISMIC RESTRAINTS: <br /> ° 3-RING BINDER, COMPLETELY DESCRIBING EACH MAJOR SYSTEM,MATERIAL AND <br /> Z EQUIPMENT PROPOSED TO BE USED. ANY PIECE OF EQUIPMENT PLACED ON THE A. ATTACHMENTS FOR PIPING AND EQUIPMENT SUPPORTED BY THE BUILDING <br /> 0 JOB WITHOUT PRIOR APPROVAL WILL BE SUBJECT TO REMOVAL AT THE SOLE STRUCTURE SHALL BE DESIGNED TO RESIST SEISMIC FORCES PRESCRIBED IN ALL pFESS/ <br /> o EXPENSE OF THE CONTRACTOR. APPLICABLE BUILDING CODES AND LOCAL AMENDMENTS ADOPTED BY THE peR T ONq DATE <br /> 11 /6/2020 <br /> B. SUBMITTALS ARE FOR INFORMATION AND COORDINATION ONLY. REVIEW OF BUILDING DEPT.. HAVING JURISDICTION. <br /> MATERIAL AND/OR EQUIPMENT SUBMITTALS SHALL IN NO WAY RELIEVE THE B. WHERE REQUIRED BY THE BUILDING OFFICIAL, PROVIDE STRUCTURAL SCALE NOTED <br /> 2 CONTRACTOR OF THE RESPONSIBILITY TO COMPLY WITH PLANS AND CALCULATIONS SIGNED BY A LICENSED STRUCTURAL ENGINEER Z <br /> o M 36473 r� <br /> SPECIFICATIONS REQUIREMENTS. POINTS OF NON-COMPLIANCE WHICH ARE NOT w m <br /> NOTED SHALL NOT BE CONSTRUED TO BE AN APPROVAL OF THE 2. SOIL, WASTE, AND VENT PIPING: AS REQUIRED BY LOCAL BUILDING CODE HAVING * Exp. 9/30/21 * DRAWN AE <br /> NON-COMPLIANCE. SUBMITTALS SHALL CLEARLY STATE WHERE EQUIPMENT DOES JURISDICTION. <br /> J NOT AGREE WITH THE CONTRACT DOCUMENTS. SHEET INDEX `P�y�FFcHAN\G �P JOB # 2013 <br /> C. ARCHITECTURAL PLANS AND SPECIFICATIONS SHALL BE REVIEWED FOR 3. WATER PIPING: AS REQUIRED BY LOCAL BUILDING CODE HAVE JURISDICTION. OF CA1�F <br /> z ADDITIONAL SUBMITTAL REQUIREMENTS. <br /> SHEET TITLE 11/06/20 SHEET NO. <br /> o <br /> • P0.1 Plumbin Specifications and Legend AU N G ENGINEERS <br /> . Electrical . Plumbing . Energy <br /> Z <br /> • P0.3 Plumbing Schedule0 P0.2 Plumbings <br /> o Details <br /> 7111 Garden Grove Blvd,Suite 108 <br /> • P0.4 Plumbin <br /> • P1.1 Plumbin Plans <br /> Garden Grove,CA 92841 POO 1 <br /> o Ph:(714)349-9181 <br /> Z • <br /> Email:info@aungengineers.com <br /> o Web :www.aungengineers.com <br />