My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 1:17:38 PM
Creation date
7/6/2021 12:58:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />r:mm�lr+tp the following checklist: <br />* In the Section H, below, describe now and wnen tnese aencrencres were or wm oe correca <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />that apply) Simulated leak rate: x 3 g.p.h.; ❑ 0.1 g.p.h ; 110.2 g.p.h. <br />x Yes <br />❑ Yes <br />x No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ No* <br />❑ Yes <br />x No* <br />Was accuracy of system product level readings tested? <br />x Yes <br />❑ Yes <br />x No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />x No* <br />Were all probes reinstalled properly? <br />x Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />x N/A <br />ea. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />that apply) Simulated leak rate: x 3 g.p.h.; ❑ 0.1 g.p.h ; 110.2 g.p.h. <br />x Yes <br />x Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />x Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />x Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />x N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />x N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />❑ Yes <br />❑ No* <br />x N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />❑ Yes <br />❑ No* <br />x N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />x Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the <br />Section <br />H. below, describe how and when these deficiencies were or will be corrected. <br />H. comments: See leak detector form <br />Monitoring System Certification <br />Page 3 of 4 <br />Eelr� <br />3 2/21 /07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.