My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:15 PM
Creation date
7/7/2021 9:13:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> U ST Monitoring Site Plan <br /> - - - - - - - - - -- - -- - - - - - - - <br /> She Address: Arch Road AnIft 4854 South Highway 99 Stockton, CA 95205 <br /> . . . . KEY <br /> A = ANNULAR <br /> X F = FILLS <br /> I t T =f! TRBE P ]PROBE <br /> 4V = VAPOR <br /> X = SUJIP SENSOR <br /> . - - - . . . . . - _ - . . . . . . . LmLeakDetector <br /> t, Al = filanway <br /> t . 89 t B = Brine Sensor <br /> }Z S =STP Sensor <br /> C = Floats & Chains <br /> X r E = E Stop <br /> v <br /> 9 r <br /> X X <br /> +PIPLNG 3 <br /> (ARROWS) <br /> Drawing of _ _ 8 . 15. ... 10 X 0� R .3 ... . . . . . . <br /> piping exit of A <br /> sump and UDC's. <br /> No underground <br /> drauring is <br /> cannot speen)hte R 3 -8 ,,. X .7 <br /> blue prints. _ <br /> L <br /> . . . . <br /> STORE ATG <br /> crit- item «rrb-rgroraridrea are nor risible io tic cerr(6frig 1wimiciart me a <br /> n <br /> p-QJes:taYrlopirsmro»;1• arrlo-asde�i•fa• itfonmtiurnlfxnpe� �. Drmrit� <br /> of to scde <br /> Date map was drawn: 2-7- 191 <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it. rather than this page, with your Monitoring System Certification. On your site plan, <br /> shcw the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring lank <br /> annular spaces, sumps , dispenser pans, spill containers, or ocher secondary containment areas : mechanical or etectrodc line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.