Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intendedfor use by contractors performing annual testing of UST spill containment structures. Thg,q mpleted form and <br />pr•intorrts from tests (if applicable), should be provided to the facility owner/operator for subm#l40bW&12Larllc(tlory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2°d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Ed Stearns ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />8883080 -UT 8883064 -UT 8883059 -UT 8883072 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic ❑Vacuum El Other <br />Comments — (inchrde information on repairs made prior to testing, and recommended folloiti <br />Facility Name: <br />ORLANDOS MARKET <br />I Date of Testing: 07-1048 <br />Facility Address: <br />18754 HWY 26 LINDEN, CA 95236 <br />Facility Contact: <br />BRANDON <br />Phone: 209-887-1100 <br />Date Local Agency Was Notified of Testing:06-2048 <br />Name of Local Agency <br />Inspector (f present during testing): SAN JOAQUIN CO. AARON <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2°d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Ed Stearns ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />8883080 -UT 8883064 -UT 8883059 -UT 8883072 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic ❑Vacuum El Other <br />Comments — (inchrde information on repairs made prior to testing, and recommended folloiti <br />Test Equipment Used: TAPE / H2O <br />Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 87 <br />2 91 <br />3 DIESEL <br />4 <br />® Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Installation Type: <br />❑ Direct Bury <br />® Contained in Sump <br />❑ Direct Bury <br />® Contained in Sump <br />Bucket Diameter: <br />11 <br />11 <br />11 <br />Bucket Depth: <br />12 <br />12 <br />14 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (TI): <br />1030 <br />1030 <br />1030 <br />Initial Reading (RI): <br />11 <br />11 <br />13 <br />Test End Time (TF): <br />1130 <br />1130 <br />1130 <br />Final Reading (RF): <br />11 <br />11 <br />13 <br />Test Duration (TF — TI): <br />1 HOUR <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />® Pass [:]Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />-arp for failed tests) <br />GAS IS PHIL TITS BUCKETS <br />DIESEL IS OPW BUCKET <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature <br />Date:07-10-18 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor, However, local requirements <br />may be more stringent. <br />