Laserfiche WebLink
Andrew Richle - 2 - 10 March 2021 <br /> <br />excavation activities, the excavation will be backfilled with either clean imported soil or <br />controlled density fill as per the City of Lodi standards and specifications. <br /> <br />Prior to the work, a start of work notice will be mailed to properties in the area where the <br />work will be conducted, and permits will be obtained from the County for the GWET and <br />SVE well abandonments. Following completion of the decommissioning activities, CHT <br />will prepare a report that documents and summarizes all the decommissioning activities <br />performed at the site. <br /> <br />Central Valley Water Board staff concurs with the work proposed in the work plan. <br />Therefore, in accordance with the proposed schedule in the work plan, by <br />15 June 2021, please submit the proposed report that documents the decommissioning <br />activities. Please provide us with a minimum of 72 hours’ notice prior to the field work <br />so that we have an opportunity to observe the work. <br /> <br />If you have any questions regarding this letter you may contact me by telephone at <br />(916) 464-4622 or by email at Bill.Brattain@waterboards.ca.gov. <br /> <br />William Brattain, P.E. <br />Water Resource Control Engineer <br />Private Sites Cleanup Unit 03/10/2021 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Christopher Flower, PG <br />Supervising Engineering Geologist <br />Site Cleanup Program <br /> <br />cc: Varinder Oberoi, Civil Hydro Tech, Los Altos <br />