Laserfiche WebLink
TABLE OF CONTENTS <br />SOIL SUITABILITY STUDY 1 <br />Introduction 1 <br />Proposed Development 1 <br />Site Description 1 <br />Existing and Proposed Septic Tank Usage 2 <br />Existing Septic System 2 <br />Proposed Septic System 2 <br />On-Site Septic Permit History 2 <br />Existing Septic Tank Usage in the Vicinity 2 <br />Septic Permit History in the Vicinity 2 <br />Ground Water Information 3 <br />Depth and Gradient 3 <br />Potential Ground Water Contamination Issues 3 <br />On-Site Wells 4 <br />Water Sample 4 <br />Soil Profile and Geologic Information 5 <br />Soil Borings 5 <br />Discussion of Soil Lithology 6 <br />Percolation Test 6 <br />Preparation and Presaturation of Percolation Test Holes 6 <br />Percolation Test Procedure 6 <br />Percolation Test Results 7 <br />Discussion of Percolation Test Results 7 <br />Discussion of Septic System Sizing 8 <br />NITRATE LOADING STUDY 9 <br />Mass Transport Soil Properties 9 <br />Sources of Nitrate 10 <br />Percolating Recharge Waters 10 <br />Quality of Rainwater 10 <br />Quantity and Quality of Domestic Wastewater 11 <br />Denitrification Reductions 12 <br />Nitrate Loading Estimate 12 <br />Discussion of Nitrate Loading Results 14 <br />Total Nitrate Impact 14 <br />CONCLUSIONS AND RECOMMENDATIONS 15 <br />LIMITATIONS 16 <br />SELECTED REFERENCES 17 <br />LOGE 2121