My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:56:27 PM
Creation date
7/16/2021 12:17:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1999
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ed Padilla <br /> October 16, 1995 <br /> Page 2 <br /> II. WINTERIZATION PAD AND ACCESS ROAD <br /> In preparation of winter disposal activities, a winterization pad <br /> and roadway have been constructed to provide easy access and <br /> minimize unloading operations. The winter pad and access ramp <br /> are shown on Figure 1 . The dimensions of the pad are 200 x 200 <br /> feet, which provides sufficient maneuverability for vehicle <br /> travel and unloading operations. <br /> The access ramp and winter pad were constructed of six inches of <br /> compacted aggregate base rock over a two foot foundation of <br /> compacted soil . The access ramp is approximately thirty feet in <br /> width with a grade of five percent. <br /> III. DRAINAGE <br /> Surface drainage throughout the winter months will generally flow <br /> to the southwest as indicated by arrows shown on Figure 1 . <br /> Surface drainage will be pumped into a retention basin located <br /> south of Module 3 as shown on Figure 1 . Any water that enters <br /> the leachate collection system will be treated as leachate. <br /> Leachate is pumped out of the module sumps and filtered through <br /> the site's leachate filtering system, which is also shown on <br /> Figure 1 . <br /> IV. BORROW STOCKPILE <br /> It is estimated that approximately 28,000 cubic yards of cover <br /> material will be needed during winter operations for the four <br /> month period spanning December to March. This material is <br /> already stockpiled as shown on Figure 1 . Additional soil may be <br /> excavated if necessary from the next module located south of <br /> Module 3 . <br /> V. SUMMARY <br /> This Winterization Plan is designed to provide for four and one- <br /> half months of seasonal operations through the winter beginning <br /> December 1995 and ending in March of 1996. In addition, adequate <br /> drainage, refuse space, and cover material are provided to ensure <br /> limited maintenance and normal operation of the landfill . <br /> GEK:MCS:vj <br /> R:IVIRGINIAjMEMOS�WINTRPLN.EP <br /> Attachment <br /> LA 63215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.