Laserfiche WebLink
Part 3. FACILITY INFORMATION <br />A. PROPOSED CHANGE (Check applicable box(es)): <br />®1. DESIGN (describe): Norte <br />®2. OPERATION (describe): Norte <br />1:13. OWNER, OPERATOR, ADDRESS, AND/OR FACILITY NAME CHANGE (describe): None <br />®4. OTHER (describe): None <br />B. FACILITY INFORMATION: <br />1. INFORMATION APPLICABLE TO ALL FACILITIES: <br />a. PEAK DAILY TONNAGE OR CUBIC YARDS 825 Tons <br />1) DISPOSAL/TRANSER (unit) <br />2) OTHER (unit) <br />b. DAILY DESIGN TONNAGE (TPD) 825 <br />c. FACILITY SIZE (acres) 320 <br />d. PEAK TRAFFIC VOLUME PER DAY (vpd) <br />e. DAYS AND HOURS OF OPERATION 7 Days Per Week, 7.00 AM To 5.00 PM <br />2. ADDITIONAL INFO. REQUIRED FOR COMPOSTING FACILITIES ONLY: <br />a. SITE STORAGE CAPACITY (cu yds) N/A <br />3. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br />a. AVERAGE DAILY TONNAGE (TPD) 400 <br />b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds) 20.9 Million <br />c. SITE CAPACITY PROPOSED (Airspace) (cu yds) <br />d. SITE CAPACITY USED TO DATE (Airspace) (cu yds) <br />N/A <br />3.9 Million <br />e. SITE CAPACITY REMAINING (Airspace) (cu yds) 17Million <br />f. DATE OF CAPACITY INFORMATION (Date) (See instructions): Aug -04 <br />g. LAST PHYSICAL SITE SURVEY (Date) 6/14/2004 <br />h. ESTIMATED CLOSURE DATE (month and year) Jun -37 <br />i. DISPOSAL FOOTPRINT (acres) 185.4 Acres <br />j. SITE CAPACITY PLANNED (cu yds) 20.9 Million <br />k. 1. (i) IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste) 1,100 <br />AND <br />(ii) WASTE -TO -COVER RATIO (Estimated) (v:v) 4:1 <br />UK <br />2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace) 0.55 <br />Part 4. SOURCE OF WATER SUPPLY (Check applicable boxes) <br />EIA. MUNICIPAL OR UTILITY SERVICE: <br />x]B. INDIVIDUAL (wells): One Well located on property <br />MC. SURFACE SUPPLY: <br />1. NAME OF STREAM, LAKE, ETC.: <br />2. TYPE OF WATER RIGHTS: <br />®RIPARIAN ❑APPROPRIATION <br />3. STATE PERMIT OR LICENSE NUMBER, IF APPLICABLE: <br />Page 2 <br />