My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:12:56 PM
Creation date
7/16/2021 12:52:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeting with Environmental Health Department <br />Regarding the Perimeter Migration Monitoring Well Project <br />(Foothill and North County Landfills) <br />April 22, 2008 <br />Purpose: to finalize well design and define requirements included in specifications for installation <br />and CQA contractors. <br />GENERAL PROJECT STRUCTURE <br />1. Driller: All construction work, two rigs on site, one site at a time. Driller must know what <br />constraints will be in place when he bids. Changing constraints after bid will be a change <br />order. Contract will define installation methods as little as possible. <br />2. CQA (Tentative): Two staff members on site, one per rig. <br />a. Characterize soils, keep field drilling log showing strata (field characterizations <br />may be approximate due to the need to watch closely for changes in soil) <br />b. Submit drilling logs and well completion figures. <br />c. Prepare completion report <br />d. Additional tasks may be assigned depending on development of project <br />e. Keep daily field report (for Field Division) <br />3. EHD: Verify that key features of well construction, as determined by EHD (depth of well, <br />depth of lower probe, seals) are constructed properly. <br />4. Solid Waste Div (Tentative): <br />a. Design well <br />b. Write specifications including constraints on driller. <br />c. Inspect construction for conformance to contract <br />d. Draft change orders for processing by Field Division <br />e. Recommend payment to Field Division <br />f. Document construction for use by CQA contractor in preparing completion report <br />5. Field Div: <br />a. Administer contract <br />b. Approve and process change orders <br />c. Approve payment <br />
The URL can be used to link to this page
Your browser does not support the video tag.