Laserfiche WebLink
Taj Bahadori <br />Page 5 of 5 <br />December 8, 2017 <br />The approximate locations of proposed extraction wells GX-8 and GX-9 are shown on the <br />attached figure. Their placement in relative close proximity to SG -6 should help reduce LFG <br />migration from that portion of the landfill. The wells will be connected to the horizontal trenches <br />above the base liner to prevent damage to the liner. <br />Please call if you have any questions. <br />Sincerely, <br />Aptim Environmental and Infrastructure, Inc. <br />Julian C. Isham, PG, CEG, CHG <br />Geology Manager <br />Attachment: Well Location Figure <br />North County 2017 NOV Final 120817.docx <br />C. <br />lULIwN C.ISNA"L <br />- No. 00719 <br />' <br />GEN0. Ti321IFIEO );, <br />B <br />CERTIFIED <br />EIGINEERIN6 <br />® GEOLOGIST <br />HYDRO <br />7�—"EOLOGIST <br />