My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.02 SURFACE COMPLETION <br />A. Contractor shall clean well enclosure housing with high-pressure hot water/steam <br />prior to installation to ensure that it is free of contamination. <br />B. Contractor shall install well enclosure plumb. <br />C. Contractor shall cut the well casing pipe to minimum required height. The well <br />enclosure lid shall open and close smoothly providing space for pump discharge <br />tubing and pump lead wires. <br />D. Contractor shall remove the PVC end caps from the top of the casing and then <br />install well plugs. <br />E. Contractor shall place coarse sand in the annular space between the enclosure <br />and the well casings. The sand shall be placed six inches below the top of the <br />well casings. <br />F. Contractor shall clean cement grout from the well casing and enclosure prior to <br />painting. <br />G. Contractor shall apply the final coat of paint on the enclosure and then shall label <br />the enclosure with the well No provided by the Engineer after installation . <br />H. Contractor shall install bollards plumb. <br />3.03 WELL DEVELOPMENT <br />A. Contractor shall inspect the interior of the casing with down -hole video camera to <br />verify that the casing has not collapsed and that grout has not intruded into the <br />well. <br />B. Prior to development, the Contractor shall allow a minimum 48 hours for the neat <br />cement to set. <br />C. Contractor shall develop groundwater wells within 7 days of completion of that <br />well. <br />D. Well development shall be in the presence of the Engineer. <br />E. Contractor shall not damage the well casing during well development. <br />F. Contractor shall remove any tools or other parts dropped in the well casing. <br />NC -Groundwater Monitoring <br />Well Specifications 12/08/17 Page 8 of 13 San Joaquin County Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.