Laserfiche WebLink
Phase 1 (continued) - 2- 10 metal/chainlink fence <br /> with 1 ' razor wire 5 apart and laser beam style <br /> alarm between fences, 24hr security with high <br /> definition cameras and monitors for inner/outer <br /> surveillance with police access, 24hr armed <br /> security, Industrial grade locks on all ingress/egress <br /> gates as well as all outside doors on buildings, <br /> conversion of building D to security/office, 50kw <br /> Generator. <br /> Phase 2 - Construction of a 72'x192' greenhouse <br /> (C), Construction of a 48'x120' greenhouse (B), <br /> waste water tank, 5 concrete parking stalls 9'x209 <br /> . <br />