My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014301
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
24300
>
2600 - Land Use Program
>
PA-1700279
>
SU0014301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2022 8:58:08 AM
Creation date
7/19/2021 2:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014301
PE
2632
FACILITY_NAME
PA-1700279
STREET_NUMBER
24300
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09310020, 24
ENTERED_DATE
7/19/2021 12:00:00 AM
SITE_LOCATION
24300 E FLOOD RD
RECEIVED_DATE
11/12/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department of Public Works <br /> z SAN JOAQUIN <br /> {� COUNTY 3, t Kris Balaji,Director of Public Works <br /> Fritz Buchman,Deputy Director/Development <br /> Greatnessrows here. <br /> 9 W�]d� for YOU David Tolliver,Deputy Director/Operations <br /> -- - <br /> Najee Zarif,Deputy Director/Engineering <br /> Kristi Rhea,Business Administrator <br /> November 15, 2021 -- <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Giuseppe Sanfilippo <br /> FROM: Christopher Heylin, Development Services Engineer <br /> Development Services Division <br /> SUBJECT: PA-1700279; A Site Approval application for the construction, operation, and <br /> decommissioning of the North Central Valley Energy Center Project consisting of a 132- <br /> megawatt battery energy storage system (BESS) on approximately 14.85 acres of a <br /> 57.28-acres parcel, which would include up to (300) battery storage containers (totaling <br /> up to 45,000 square feet) and associated on-site support facilities including an 11,000 <br /> square-foot Project collector substation, up to (50) inverters (totaling up to 6,500 square <br /> feet), collector lines, fencing, access roads, an operations and maintenance building, a <br /> supervisory control and data acquisition (SCADA) system, and other ancillary facilities <br /> and equipment. Approximately (17) of the proposed inverters would include screening <br /> barriers for the purpose of attenuating inverter noise, should all inverters operate at <br /> maximum capacity. The screening barriers would be approximately 14 feet tall with <br /> respect to grade. The Project also includes (2) power poles and a 115-kilovolt overhead <br /> generation transmission line to connect the BESS to the adjacent Pacific Gas and <br /> Electric Bellota Substation. A 1.52-acre expansion of the Bellota Substation footprint <br /> would also be required to support grid interconnection of the Project; located on the <br /> south side of Flood Road, 0.8 miles west of Escalon-Bellota Road, Linden. <br /> (Supervisorial District 4) <br /> OWNER: William Earl Jr. & Marilyn Van Tassel APPLICANT: North Central Valley Energy <br /> Storage, LLC <br /> ADDRESS: 24300 E. Flood Road, Linden APN: 093-100-20 & -24 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> Flood Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />
The URL can be used to link to this page
Your browser does not support the video tag.