My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:48:52 PM
Creation date
7/20/2021 10:40:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANOAQU I N Environmental Health Department <br />COU NI T Y I Y Time In: <br />+_,fr Time Out: <br />Greotr+ess �row3 here. <br />Underground Storage Tank Program Service Request Inspection Report <br />Name of Facility: UNITED # 5447 <br />Date: 12/09/2021 <br />Address: 1469 E HAMMER LN , STOCKTON 95210 <br />Requestor: MATT THOMAS, CGRS INC <br />Telephone: (626) 627-8316 <br />Program Element: 2309 - UST RETROFIT - Minor Plan Check <br />Request #: SR0084152 <br />Inspection Type: 198 - UST RETROFIT REPAIR PLAN CHECK <br />Onsite Service Technician: Leonardo Rangel <br />ICC Service Tech/Installer Exp. Date: 08/12/2023 <br />Manufacturer training: Bravo, 12/04/23 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />On site and verified the following: <br />1. Removal of barriers and installation of Bravo sensor cups and Bravo retrofit kit within UDCs 1/2, 3/4, 5/6, 7/8, and 9/10**, so <br />that potential leaks drain to one low point toward UDC sensor. <br />**Amend the permit to include the scope of work done on UDC 9/10, and submit the amended permit to EHD. <br />To minimize person to person contact EHD is choosing to write the name of the person receiving the report instead of having <br />them sign. <br />The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br />Safety Code. If a reinspection is required, fees will be assessed at the current hourly rate. <br />Received by: <br />EH Specialist: ELIANNA FLORIDO <br />Name and Title: Emailed to Matt Thomas, Contractor <br />Phone: (209) 616-3050 <br />FA0001570 SR0084152 SC198 12/09/2021 <br />EHD 23-01 Rev. 09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.