My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:48:52 PM
Creation date
7/20/2021 10:40:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fittings listed and illustrated here are common examples of what may be installed in your Bravo <br />B-2000 series shallow steel UDC's. In many cases entry fittings were used for pipe or conduit that they <br />were not designed for. Read every scenario below as there are valuable tips, warnings and <br />instructions. Some may apply broadly. Bravo does not make any requirements for which combinations <br />are acceptable, nor does Bravo specify any heights, elevations or measurements for adjustments. <br />FR-ES1 RETROFIT <br />FEF -EBS CONDUIT FITTING <br />For this fitting, remove the existing boot & clamps, clean the <br />contact surfaces of any/all contaminants, abrade the contact <br />surfaces of both pipes and install the FR-ES1 split FRP sleeve <br />centered over both diameters. You can pack the interior of the <br />steel coupler with foam cord or other material first. Then pack <br />each half with Bravo epoxy, join them together and secure with <br />clamps to cure. Bead with vulkem where it contacts the floor. <br />FR-MYE-5 RETROFIT <br />MYERS HUB (MYE) CONDUIT <br />FITTING For MYE°s, clean the exterior of the fitting <br />and sand the epoxy paint off of the steel floor about 1" out <br />from its outer diameter. Apply Bravo epoxy to interior of <br />FR-MYE-5 split FRP sleeve and install over the MYE fitting <br />with clamps. Ensure it is completely encapsulated with no <br />trapped air. Then apply a generous bead of vulkem to the <br />outside of the FRP sleeve where it contacts the floor. Be <br />sure to re -coat any steel that was exposed from sanding 1 <br />cleaning. Just above it, where commonly another pipe <br />protrudes through and a conduit comes through that pipe, <br />follow the FR-ES1 retrofit directions above to seal these <br />two pipes to each other. <br />BH -1-112 VAPOR FITTING <br />Clean the exterior surfaces of the fitting and repeat the <br />instructions listed above for the Myers Hub fitting. It is <br />common for a vapor shear valve to be threaded directly <br />onto this type of fitting. If so, then the FR-MYE-5 should <br />apply, but if there is a nipple above, then the FR-ES1 may <br />also be needed. It is detailed below and shown on the left. <br />In the case where this fitting was instead used as a conduit <br />entry, (as shown) first install the FR-ES1 to the top -most <br />part of the threads and the conduit that protrudes through. <br />ii -B2000 -RETROFIT -KIT -1 4A <br />
The URL can be used to link to this page
Your browser does not support the video tag.