My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:48:52 PM
Creation date
7/20/2021 10:40:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ca <br /> N <br /> 0 •� 8. <br /> C <br /> r7 C $ <br /> SCOPE OF WORK <br /> STORAGEww I w ! <br /> 1 . Remove five (5) concrete to be broken . Procuct lines to be disconnected at unions. ¢ $A <br /> 2. Install three (3) new Gilbarco Encore 700s 3+0 dispensers and two (2) newa ; ? <br /> HEALY CAS & ! Gilbarco Encore 700s 3+1 dispensers using existing dispenser UDC's/product HO- <br /> VENT PIPES piping and new conversion frames. asf " € i � <br /> NOTE: Dispensers to be installed per manufacturer's instructions. 'g " fr ' a <br /> 3. Remove existing Veeder-Root ISD flow meters from existing dispensers and <br /> 89 <br /> � g <br /> reinstall them in the new dispensers. � � $ J e ee <br /> NOTE : All Veeder-Root equipment to be installed per manufacturer's instructions. <br /> 4. Start up and calibrate new dispensers. <br /> NOTE: Start-up to be performed by F H International - License #796812 <br /> Calibration to be performed by Ralph Righi Pump Calibration - License #03993 p� <br /> O ` CONVENIENCE 1� ^ 5. Perform monitor certification O <br /> �o STORE ® ® 89 V J 6. Perform final inspection in front of inspector. z <br /> ( L <br /> n <br /> cr O <br /> O °- v <br /> \ . : CU <br /> \ �� / • . ( L <br /> _ w L1. Q <br /> Q <br /> LU <br /> o <br /> LEGEND 3 + D —Wdpmductdspanser �— RCT U) <br /> A —Mnulnr (MPD) with a single ronle <br /> HAMMER LANE ' _ ' _ ' — ' _ ' — ' _ ' _ ' . (per side) to dispense Z I=_ <br /> FS —Fill Sump Wee grades of gasoline <br /> F —Fill bucket 3 + 7 —Mulfipmduct dispenser <br /> V—Vapor recovery bucket (MPD) MIT a single nozzle <br /> TS _Turbino Sump (per side) to dispense 1/16" = 1r <br /> ® _Emergency Shutoff Switch three grades of gasoline <br /> ® _VoedarRoetTL5350 and anadded nonle 05-01-2020 <br /> (per for Diesel <br /> �j_VeadarRoot ttSaw per sTP- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.