My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:48:52 PM
Creation date
7/20/2021 10:40:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T-1 91 <br />T-2 89 <br />T-3 87 <br />T-4 Diesel <br />Are both vent and tank riser piping <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />® No <br />® No <br />® No <br />® No <br />OPE Model <br />OPW 71SO <br />OPW 71 SO <br />OPW 71 SO <br />OPW 71 SO <br />What is the OPE response when activated? <br />❑x Shutoff <br />® Shut off <br />® Shut off <br />® Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />© Restricts <br />® Restricts <br />® Restricts <br />® Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />M No <br />® No <br />® No <br />® No <br />At what level in the tank is the OPE set to <br />104 1/2" <br />104 5/8" <br />101 3/4" <br />101 7/8" <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />94.8% <br />94.9% <br />92.9% <br />93.1% <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />❑x Yes <br />® Yes <br />® Yes <br />M Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />❑x Pass <br />® Pass <br />❑x Pass <br />❑x Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail' and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.