Laserfiche WebLink
SAN JOAQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> CC)uNTY SITE APPROVAL <br /> FILE NUMBERIA210 0 0 5 2 <br /> Owner Information Applicant Information <br /> Name:International Paper Company Name:Knapheide Truck Equipment Center <br /> Mailing Address:6400 Poplar Avenue, Memphis TN,38197 Mailing Address:405 Gandy Dance Drive,Tracy CA 95377 <br /> Phone:(901)419-9000 Phone:209-855-8400 <br /> Email: Email:Pnorem@knapheide.com <br /> Applicant's Representative Information Design Professional Information <br /> Name:Dani Robinson Name:RMW <br /> Mailing Address:1331 N California Blvd, Suite 350 1 Mailing Address:160 Pine St,San Francisco,CA 94111 <br /> Walnut Creek, CA 94596 Attention:Peter Vatkov <br /> Phone:415-802-5759 Phone:(415)781-9800 <br /> Email:Dani.Robinson@am.jll.com Email:pvatkov@rmw.com <br /> Project Description <br /> (Attach additional sheets as necessary) <br /> Renovation of existing 58,563 building with yard and the development of the adjacent undeveloped 4-acre site for storage of truck bodies. Proposed use: <br /> Building will be used for installation completed truck utility bodies onto truck chassis. Process included some minor welding, painting within a paint booth <br /> I(being relocated from Knapheide's current facility in Tracy)and washing in a dedicated wash bay. Building improvements include:Adding paint booth, <br /> adding locker rooms/restrooms, remodeling office area,adding truck doors facing ajdacent vacant 4-acre lot,converting dock hight doors facing Hardaway <br /> road to ground level truck doors,painting and updating the building exterior and enclosing the exterior dock adjacent to rail spur for parts storage. <br /> Site Improvements include: Repaving/repair of existing yard and parking lot,drought resistant landscaping, grading/paving of undeveloped 4-acre parcel <br /> for storage of truck chassis, and utility bodies, install/repair of the exterior yard and parking lot lighting,addition of two driveways from the new yard area <br /> to Bozzano Road to facilitate delivery truck movements. <br /> Will the project include more than one(1)phase? (maximum of 2 phases)Yes ❑ No ❑■ <br /> Length of time (maximum of 5 years):12 to 14 months <br /> Note:For questions regarding phasing, contact the Planning Division at 209-468-3121. <br /> Property Information <br /> Assessor Parcel Number Property Address Property Williamson Act Contract(Y or N) <br /> Size <br /> 101-290-09 3400 N Bozzano Road,Stockton 4 acres N <br /> 101-290-07 3550 N Bozzano Road,Stockton 14 acres i N <br /> 1 I I I <br /> Page 1 of 6 <br /> Updated 08/28/2020 <br />