Laserfiche WebLink
COMMUNITY DEVEL ''MENT DEPARTMENT <br /> SITE APPROVAL <br /> FILE NUMBER: <br /> (Attach additional sheets as necessary) <br /> See Chapter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposedproject: <br /> Describe any machinery,equipment, or transportation noise that may result from the proposed project: <br /> Onsite the buyer will be utilizing a fork lift for the relocation of truck bodies and materials. Noise associated with the forklift may be beeping to indicate the vehicle <br /> reversing. Site will receive deliveries from trucks trailers. Noise will be typical for street noise. I <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> The site currently has several light poles in the existing parking area of 101-290-07. The intention is to replace the existing light poles with code compliant <br /> light poles and install the same in the currently undeveloped 4 acres for the storage of the truck bodies as well as security lighting on the exterior of the building. <br /> Light levels will be comply with city/county ordinances and comply with code and are indicated in the attached lighting drawings. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> Possible odors from the paint booth and minor welding operations. Appropriate exhaust systems are intended as part of the renovation of the shop space. <br /> Page 5 of 6 <br /> Updated 08/28/2020 <br />