My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_WDR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5950
>
4200 – Liquid Waste Program
>
PR0530041
>
_WDR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 8:37:59 AM
Creation date
7/22/2021 8:37:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
WDR
RECORD_ID
PR0530041
PE
4242
FACILITY_ID
FA0004443
FACILITY_NAME
CBUSO dba Woodbridge Winery
STREET_NUMBER
5950
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
Rd
City
Acampo
Zip
95220
APN
01709058
CURRENT_STATUS
01
SITE_LOCATION
5950 E Woodbridge Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT D -3- <br />R5-2012-0103 <br />CONSTELLATION WINES U.S., INC. dba WOODBRIDGE WINERY <br />WOODBRIDGE WINERY <br />SAN JOAQUIN COUNTY <br /> <br />SECTION 2 - Monitoring Well Installation Report <br /> <br />The monitoring well installation report must provide the information listed below. In addition, <br />the report must also clearly identify, describe, and justify any deviations from the approved <br />workplan. <br /> <br />A. General Information: <br />Purpose of the well installation project <br />Brief description of local geologic and hydrogeologic conditions encountered during <br />installation of the wells <br />Number of monitoring wells installed and copies of County Well Construction Permits <br />Topographic map showing facility location, roads, surface water bodies <br />Scaled site map showing all previously existing wells, newly installed wells, surface <br />water bodies, buildings, waste handling facilities, utilities, and other major physical <br />and man-made features. <br /> <br />B. Drilling Details (in narrative and/or graphic form): <br /> On-site supervision of drilling and well installation activities <br /> Drilling contractor and driller’s name <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals and logging methods <br /> W ell boring log <br />- Well boring number and date drilled <br />- Borehole diameter and total depth <br />- Total depth of open hole (same as total depth drilled if no caving or back-grouting <br />occurs) <br />- Depth to first encountered groundwater and stabilized groundwater depth <br />- Detailed description of soils encountered, using the Unified Soil Classification <br />System <br /> <br />C. Well Construction Details (in narrative and/or graphic form): <br /> Well construction diagram, including: <br />- Monitoring well number and date constructed <br />- Casing and screen material, diameter, and centralizer spacing (if needed) <br />- Length of well casing, and length and position of perforated interval <br />- Thickness, position and composition of surface seal, sanitary seal, and sand pack <br />- Type of well caps (bottom cap either screw on or secured with stainless steel <br />screws) <br /> <br />E. Well Development: <br /> Date(s) and method of development <br /> How well development completion was determined <br /> Volume of water purged from well and method of development water disposal <br /> Field notes from well development should be included in report <br />
The URL can be used to link to this page
Your browser does not support the video tag.