My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
1900 - Hazardous Materials Program
>
PR0543518
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 8:40:45 AM
Creation date
7/26/2021 3:28:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543518
PE
1921
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials in the labelled containers back to MFS-Stockton were listed in the July 13, <br /> 2021 did not require a registered transporter. <br /> 8. Violations 202 and 203—Submit a copy of the supervisory and personnel training materials used <br /> to prevent future transportation and disposal of hazardous waste at an unauthorized point. <br /> Submit a copy of the training records. <br /> a. Response: Copies of completed to date Training records for supervisors Chad Yelm and <br /> Jason Torres, and Wastewater Treatment System Operator Travis Bates—attached. <br /> 9. Violation 303—Submit the following: <br /> a. a designated facility signed hazardous waste manifest for the clean out of processing <br /> line secondary containment containing solids and liquids with pH 1.5 <br /> i. Response: Manifest#014649293FLE in attachments—attached. <br /> b. a signed hazardous waste manifest/disposal record of treatment system secondary <br /> containment containing solids (in trash can). <br /> i. Response: These solids were common trash,they were not hazardous waste. <br /> The container should not have been left in the secondary containment area. <br /> 10. Violation 406-Submit the name, street address, mailing address and telephone number of the <br /> owner or operator of the facility where Metal Finishing Solutions' empty 55-gallon drums were <br /> shipped to, prior to the drums being picked up by ABCO Products Co. <br /> a. Response: Republic Services Forward Inc. &Austin Rd. Landfills, 9999 S Austin Rd, <br /> Manteca, CA 95336: Phone#(209) 982-4298 <br /> 11. Violation 505—Submit a corrective action statement addressing the floor degradation of the <br /> concrete treatment system secondary containment observed at the time of inspection. <br /> a. Response: the secondary containment area that showed floor degradation to the <br /> concrete sealant has been corrected,see pictures—attached in attachments. <br /> 12. Violation 509-Submit proof that the leaking pump was fixed (e.g. a work order). <br /> a. Response: see picture—attached in attachments. <br /> 13. Violation 601—Submit designated facility signed hazardous waste manifest(s)for the wastes on- <br /> site longer than 90 days, listed on the inspection report for this violation. <br /> a. Response: Manifest#016134872 FILE—attached in attachments. <br /> 14. Violation 605—Submit a corrective action statement stating how the drum storing unknown <br /> liquid and city water treatment resin (beads)was labeled for hazardous properties, physical <br /> state, composition (contents). <br /> a. Response: Previously submitted—The noted Hazardous Waste containers have been <br /> properly labeled as containing hazardous waste. Inspection logs and hazardous material <br /> transfer records should minimize eliminate future excursions. <br /> Permit By Rule Treatment Inspection: <br /> 1. Violations 101, 203- <br /> a. Provide a timeline as to when the PE will complete an internal inspection of the tanks. <br /> Have the PE re-certify the tank assessment once the PE completes the internal <br /> inspection. <br /> i. Response:Juliette Freestone PE & Project Manager for Morris Shaffer <br /> Engineering, LLP will reach out to Elianna Florido-San Joaquin County <br /> Environmental Health Department to discuss internal inspection details and <br /> resolution of these violation. <br /> 2. Violation 112—Submit a complete treatment system waste analysis plan, which includes a <br /> separate chemical analysis at the point of waste generation for rinse tanks 3,4,6,7,9,10, and 11, <br /> and clean out of the secondary containment under the processing line, before the wastes enter <br />
The URL can be used to link to this page
Your browser does not support the video tag.